My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NELSON NYGAARD - 2015
Clerk
>
Contracts / Agreements
>
N
>
NELSON NYGAARD - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 12:08:09 PM
Creation date
9/28/2015 5:24:08 PM
Metadata
Fields
Template:
Contracts
Company Name
NELSON\NYGAARD
Contract #
A-2015-042
Agency
PUBLIC WORKS
Council Approval Date
4/7/2015
Expiration Date
4/6/2016
Insurance Exp Date
9/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Safe Mobility Plan I Revised Scope of Work <br />City of Santa Ana, CA <br />• Identifying roadways for potential reclassification can introduce flexibility in design that <br />recognizes walling and biking activity patterns and demand <br />• Ongoing educational activities that clarify roadway user behavior for multiple modes, <br />provided in multiple languages and/or utilizing recognizable symbols rather than words. <br />Outreach can also alert users to new facilities, such as bicycle boulevards parallel to <br />arterial corridors <br />• Corridor access management is a longer-term FHWA recognized proven strategy which <br />can be incorporated into the Circulation Element and Active Transportation Plan, <br />identifying corridors with excess driveways which serve as potential conflict points. <br />• Evaluation recommendations identifying opportunities for enhanced data collection for <br />future analyses <br />• Roadway design standards and guidelines based on any identified roadway factors that <br />are over -represented in the collision analysis <br />6.1 Memo and Table of Recommended Countermeasures <br />Recommended countermeasures will be informed by the data collection, field review, and <br />collision analyses tasks, and will build on the Preliminary Menu of Countermeasures identified in <br />the collision analysis memo. We will develop a set of engineering, education, and enforcement <br />recommendations to improve safety throughout Santa Ana, including in neighborhoods where <br />safety improvements will reduce health and income disparities. Based on the collision analysis <br />and field review, we will provide a preliminary list of up to 50 candidate project locations with <br />preliminary safety recommendations. Based on client feedback, we will develop a more detailed <br />project table for the top 40 priority locations and corridors. <br />6.2 Project Cut Sheets <br />We will develop project cut sheets for the highest priority locations, which will provide detail on <br />existing conditions, proposed solutions, cost, and other planning considerations. The sheets will <br />be suitable for including in applications for project funding. Based on anticipated immediate <br />grant applications, 20 project cut sheets are budgeted in this proposal. Additional cut sheets can <br />be provided for additional priority locations as an optional task. <br />6.3 Toolbox of Countermeasures <br />We will develop a toolbox of countermeasures with guidance that matches each to the appropriate <br />collision types, risk factors and roadway contexts. There will be a separate summary table for <br />pedestrian and bicycle collisions, though some countermeasures may appear in both. <br />Deliverables: Technical memorandum describing recommended countermeasures at an area or <br />citywide level (e.g. education or enforcement) as well as a detailed project <br />table. <br />Project cut sheets for 20 priority projects. <br />Toolbox of countermeasures by risk factor, collision type, and applicable <br />roadway type <br />Assumptions and/ or exclusions to the scope of work <br />• Although potential project locations will be identified citywide, for the purpose of <br />budgeting, countermeasure identification and project cut sheets are limited 3o and 5, <br />respectively. <br />• Additional locations for countermeasure identification and/or project cut sheets can be <br />provided for an additional fee, as identified in the optional task portion of our budget. <br />NelsonlNygaard Consulting Associates, Inc. 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.