My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DESMOND, DONNA ASSOCIATES -2015
Clerk
>
Contracts / Agreements
>
D
>
DESMOND, DONNA ASSOCIATES -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:26:35 AM
Creation date
9/30/2015 11:46:40 AM
Metadata
Fields
Template:
Contracts
Company Name
DESMOND, DONNA ASSOCIATES
Contract #
A-2015-159
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2020
Insurance Exp Date
12/1/2018
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Assistance Procedures Manual EXHIBIT 10-H <br />Sample Cost Proposal <br />EXHIBIT 10-H SAMPLE COST PROPOSAL (EXAMPLE ##3) <br />l9'ate:,111ndc-ups ate,lyot gllnwe <br />Consultant <br />COST PER UNIT OF WORK CONTRACTS <br />(GEOTECI{NICAL AND MATERIAL TESTING) <br />Contract No. Date <br />Page_ of_ <br />Unitlltem of Work: <br />(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study) <br />Include as many Items as necessary. <br />DIRECT LABOR Hours Hourly Total ($) <br />Billing <br />Rate ($) <br />Professional (Classification) <br />Sub-professional/Technical* <br />EQUIPMENT (with Operator) <br />OTHER DIRECT COST <br />Description Unit(s) Unit Cost <br />Mobilization/De-mobilization $ <br />Supplies/Consumables (Itemize) <br />Travel/Mileage T $ <br />Report (if applicable) $ _ <br />TOTAL COST PER UNIT OF WORK <br />NOTES: <br />• Denom labor subject to prevailing wage with asterisk (*}. <br />• Hourly. billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to all clients <br />(Commercial, Private or Public). <br />• Hourly billing rates include hourly wage rate, net fee/profit, indirect cost rate, and actual direct equipment rate. <br />• Mobilization/De-mobilization is based on site location and number and frequency of testslitems. <br />• ODC items should be based on actual costs and supported by historical data and other documentation. <br />ODC items that would be considered "tools of the trade" are not reimbursable. <br />Page 5 of 5 <br />LPP 15-01 January 14, 2015 <br />A A <br />
The URL can be used to link to this page
Your browser does not support the video tag.