My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VA CONSULTING
Clerk
>
Contracts / Agreements
>
V
>
VA CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 2:52:38 PM
Creation date
10/22/2015 1:46:34 PM
Metadata
Fields
Template:
Contracts
Company Name
VA CONSULTING
Contract #
A-2015-174
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
11/24/2015
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />Sample Task Order <br />CITY OF SANTA ANA <br />ON -CALL ENGINEERING SERVICES <br />As part of their proposal in response to RFP 14 -0378, the Consultant provided a Sample Task <br />Order scope of work. This Sample Task Order included the following to provide a privacy wall <br />design, minimum level of geotechnical /soils report, survey work, plans, specifications, and <br />estimates: <br />1. Hours by staffing level & category (provided in the Excel Spreadsheet* provided), <br />2. Total Fee (in the Excel Spreadsheet provided), <br />3. Most responsive schedule deemed feasible, <br />4. As part of this Sample Task Order, a narrative scope of work was also provided with the <br />following subtasks: <br />• Project Kick - off /Meetings <br />• Survey <br />• Geotechnical Materials Testing & Soils Report <br />• Privacy Wall Design Plans <br />• Specifications <br />• Engineer's Estimate <br />• As -Built Plans <br />The sample wall length was for an 800 LF for a privacy wall height varying from 10 -16 feet of <br />exposed height where private property (homes) would abut the one side of the wall and public <br />right -of -way would abut the other side of the wall. <br />In a separate one -page narrative scope of work and project approach was provided for all <br />tasks necessary to provide this privacy wall Sample PS &E Task Order project. Any additional <br />standard plans proposed to be used for this design or other approaches necessary to address <br />the parameters indicated herein were also included. <br />For the plan and profile sheets, inclusive of any detail sheets /notes and the scale shall be at <br />20 -scale and conform to all requirements detailed in this RFP, the City's Standard plans and /or <br />other recommended standard plans that the consultant may recommend. <br />*Note: Prevailing wages may apply to this work. <br />City of Santa Ana Scope of Work <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.