My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-12-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/01/2015
>
FULL PACKET_2015-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 2:56:41 PM
Creation date
11/30/2015 4:00:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/1/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS FOR ZOO CARE AND QUARANTINE FACILITY <br />RFP NO. 15-079 <br />SCOPE OF WORK <br />DESCRIPTION AND SCOPE OF WORK <br />The City of Santa Ana is seeking a qualified contractor to provide site improvements, furnish, and install <br />a new 12 x 40 foot modular building at the Santa Ana Zoo at Prentice Park as described herein. <br />Background <br />The Santa Ana Zoo at Prentice Park opened to the public in 1952, continual development and <br />improvements led to accreditation by the Assodiation of Zoos and Aquariums (AZA) in 1985. The <br />proposed Zoo Care and Quarantine Facility will provide a secure space for new animals to the zoo to <br />undergo preventative health screenings in keeping with current standards of the AZA and United States <br />Department of Agriculture. The new facility will provide a safer working space for the staff, and allow <br />for easier acquisition of animals, ultimately furthering the Zoo's mission "To instill a passion for the <br />natural world through education, recreation and conservation." <br />Scope of Work <br />A. IMPLEMENTATION <br />1. City staff shall have the right to modify, reduce, or delete the services as needed by City. <br />2. Successful proposer shall be responsible for manufacture, delivery, site work, off- <br />loading, assembly, placement and complete turnkey internal and external hook-up of <br />systems including providing site electrical, water, and sewer to proposed building. <br />3. Scope of work includes the entry decking, ramps, steps, and railings. <br />4. Successful proposer shall be responsible for plan submittal and approval to the City of <br />Santa Ana Building Department prior to start of construction. <br />5. Working hours are Monday through Friday 8:00am to 5:00pm. <br />6. Proposer shall review and incorporate the specifications in the detailed scope of work in <br />the presented plans. <br />a. A-1 Site Plan <br />b. A-2 Enlarged Site Plan/Floor Plan Keynotes/Deck Plan <br />c, A-2.1 Floor Plan Keynotes <br />d. A-3 Modular Building Elevations Details and Specifications <br />e. A-4 Specifications and Scope of Work Delineation <br />f. U-1 Site Utility Plan <br />7. Proposer supplied products shall be equal to or better than: <br />a. Lockers - Ideal Products Inc. – IDEAL 2000 Series Lockers <br />b. Flooring - Methyl Methacrylate Acrylic Flake Flooring by Oakridge Industries <br />c. Lightinq - Lithonia Lighting Wet Location Enclosed and Gasketed Lighting <br />Fixtures <br />d. Washer/Dryer - GE Model WCVH4800K Washer and GE DCVH480EK Dryer <br />B. PERFORMANCE SCHEDULE <br />The contract term shall be a period of four (4) months from award of bid. <br />— <br />City of2O�rw 41.5-079 �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.