Laserfiche WebLink
Date: <br />Attn: <br />Owner: <br />Project: <br />Bid Date: <br />Traffic Loops Crackfilling, Inc. <br />946 S. Emerald Street, Anaheim CA 92804 • Tel: (714) 520 4026 Fax: (714) 520 4027 <br />State License No. 652956 • Class C-10 & C-32 • DBE & UDBE No. 38033 <br />DIR Registration No. 1000003794 • Expiration Date: 06/30/2016 <br />Email: Mailan@ticinc-ca.com or Estimating@ticinc-ca.com <br />10/5/2015 Quotation <br />Estimator <br />City of Santa Ana <br />Project No. 14-6799, Federal Project No. HSIPL 5063(152) - T/S Installation on Newhope Street at Camille St. <br />Project No. 14-6800, Federal Project No. HSIPL 5063(15z) - T/S Modification on Segerstrom Avenue at Bear St. <br />10/06/2015 @ 2:00 PM <br />BID ITEM DESCRIPTION QTY. UNIT UNIT PRICE ITEM TOTAL <br />Project No. 14-6799 <br />9 <br />Install Traffic Signal Loop Detector (Type D Loop) <br />14 <br />EA <br />325.00 <br />4,550.00 <br />10 <br />Install Bicycle Loop Detector (Type E Loop) <br />6 <br />EA <br />235.00 <br />1,410.00 <br />11 <br />Install Bicycle Loop Detector (Type Q Loop) <br />2 <br />EA <br />325.00 <br />650.00 <br />Project No. 14-6800 <br />37 <br />Install Traffic Signal Loop Detector (Type D Loop) <br />11 <br />EA 325.00 <br />3,575.00 <br />38 <br />Install Bicycle Loop Detector (Type E Loop) <br />8 <br />EA 235.00 <br />1,880.00 <br />TOTAL BID AMOUNT: <br />$ 12,065.00 <br />-Quote is good for 180 days from the date of this proposal. <br />•10 days notice required for scheduling. <br />-Site must be ready with cat -track or permanent striping prior to loop installation. <br />-Additional charges may incur for extra move -ons. <br />Our quote includes: <br />1- Lay out, saw cut, wash, blow, dry, seal, and megg <br />2- Loop saw cut shall be filled with Hot Melt Sealant <br />3- Insurance coverage up to $1 million, general aggregate <br />up to $2 million, umbrella up to $2 million <br />4- Traffic control <br />5- One move -on <br />Our quote excludes: <br />1- Bond fee, permit fee, utilities fee, advance sign <br />posting of any kind, or notifying residents <br />2- Traffic control plan <br />3- Weekend work <br />4- Conduit, stub -out, splice <br />All inclusions and exclusions are to be incorporated into our contract. If either party becomes involved in litigation or <br />arbitration arising out of this contract, the court or arbitration panel shall award attorney's fees and costs to the prevailing party. <br />Please call if you have any questions or need more information. <br />Sincerely, <br />Mai -Lan Nguyen <br />Page 1 of 1 <br />