My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR THE HERITAGE 2001 E DYER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
75A - PH - EIR THE HERITAGE 2001 E DYER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:39:05 PM
Creation date
1/28/2016 4:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
2/2/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. The City received a total of eight written comment letters during the <br />public review period and evaluated all comments received from the <br />persons or agencies that reviewed the Draft EIR. Pursuant to <br />Section 15088 of the State CEQA Guidelines, the City, as the lead <br />agency for the project, has reviewed all comments received on the <br />document. The City provided written responses to all agencies and <br />members of the public commenting on the Draft EIR at least 10 <br />days prior to the Planning Commission hearing and 30 days prior to <br />certification of the EIR. <br />7. The City has prepared a Final EIR, consisting of comments and <br />recommendations received during the 45 -day public review and <br />comment period on the Draft EIR, written responses to those <br />comments, and revisions and clarifications to the Draft EIR in <br />response to those comments. For the purposes of this Resolution, <br />the "EIR" shall refer to the Draft EIR, including all of the technical <br />studies and appendices to the Draft EIR, as revised by the Final <br />EIR's revisions, together with the other sections of the Final EIR, <br />including all of the technical studies, attachments and appendices <br />to the Final EIR. <br />8. Findings of Fact with respect to environmental impacts, including <br />environmental impacts identified in the Final EIR as potentially <br />significant, but which the City finds can be substantially lessened <br />through the imposition of feasible mitigation measures identified in <br />the Final EIR, are described in Exhibit A attached hereto and <br />incorporated herein by this reference. <br />9. As a result of the environmental analysis, two significant impacts <br />were found from the construction of the proposed project that <br />pertains to air quality and traffic, Accordingly, the City has also <br />prepared a Statement of Overriding Considerations in compliance <br />with Public Resources Code Sections 21081 and CEQA Guidelines <br />Section 15093, which finds that specific economic, legal, social, <br />technological or other benefits of the proposed project outweigh the <br />significant and unavoidable impacts identified in the EIR, as <br />described in Exhibit 6 attached hereto and incorporated herein by <br />this reference, <br />10. Mitigation measures have also been provided to address potential <br />environmental impacts, with a list of these mitigation measures <br />found within the Mitigation Monitoring and Reporting Program <br />attached hereto as Exhibit C and incorporated herein by this <br />reference. Mitigation measures have been outlined to address <br />potential impacts on air quality, noise, transportation and traffic, <br />utilities and service systems, and climate change, <br />Resolution No. 2016 -XXX <br />Page 3 of 16 <br />75A -139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.