Laserfiche WebLink
the Project or the Property provided that they (1) are standard fees <br />applicable to all development in the City (although actual fee rates may <br />vary within the City where bona fide Citywide fee zones have been <br />established), (2) are not applicable primarily or only to this Project, or (3) <br />are not imposed to either (a) mitigate, offset or compensate for Project <br />impacts which were analyzed in the environmental impact report prepared <br />for the Project, or (b) duplicate any project design features conditions of <br />approval, agreements, or mitigation measures contained in this <br />Development Agreement, <br />5.7 Open Space. All common area open space on Lots A and B of Vesting <br />Tentative Tract Map No. 17962 must be built in the first phase. <br />5.8 Phasing of Project. The parties agree and acknowledge that the Project <br />may be built in three (3) phases, but that, except as otherwise expressly <br />stated herein, all conditions and mitigation measures shall be <br />implemented as part of the initial phase; provided, however that Owner <br />may propose to delay to the second phase on -site conditions (e.g., <br />sidewalks) that could be damaged by future construction. Additionally, <br />Owner shall build all private streets and the central park in the first phase. <br />Prior to issuance of the first building permit for the Project, Owner shall <br />submit a proposed Phasing Plan to the City, for review and approval by <br />the Executive Director of the Planning and Building Agency. The <br />proposed Phasing Plan shall contain those items Owner deems <br />necessary, but shall include the timing for first and second phase <br />construction and interim site improvements (i.e., landscaping, internal <br />circulation) between the phases. The approved Phasing Plan must be <br />implemented within six (6) months after completion of the first phase (i.e., <br />issuance of first Utility Release), Generally, the phases shall proceed as <br />follows: <br />Phase I <br />The first phase of the project would consist of 335 apartment homes within <br />two five -story apartment buildings wrapping a parking structure. This <br />phase would be built on the south side of the parcel facing Dyer Road. <br />Five different unit types and nine different floor plans are proposed for the <br />project, with the units ranging from studio to three bedroom units. This <br />phase also includes approximately 9,700 square feet of commercial and <br />restaurant space. The units would be wrapped around a 6'/2 -level garage <br />that will contain 646 parking spaces, with another 18 spaces on the private <br />drive. Parking is provided at a rate of approximately 1.9 parking stalls per <br />unit, which includes guest and commercial parking. <br />Also to be built within this phase is a two - story, 56,000 square foot office <br />building that will house the current data center tenant as well as other <br />75A -77 <br />