My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - EIR THE HERITAGE 2001 E DYER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/02/2016
>
75A - PH - EIR THE HERITAGE 2001 E DYER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 4:39:05 PM
Creation date
1/28/2016 4:04:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
2/2/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 <br />Mitigation Monitoring and Reporting Program <br />Pursuant to Section 21081.6 of the Public Resources Code and the CEQA Guidelines <br />Section 15097, a lead agency is required to adopt a monitoring and reporting program for <br />assessing and ensuring compliance with the required mitigation measures applied to a proposed <br />project for which an EIR has been prepared. As stated in the Public Resources Code <br />(Section 21.081.6(a)): <br />".., the public agency shall adopt a reporting or rnonitoringprograni for the changes node <br />to the protect or conditions oJ'prg1ect approval, adopted in order to mitigare or avoid <br />significant effects on the enidronnaetit. " <br />Section 21081.6 provides general guidelines for implementing mitigation monitoring programs <br />and indicates that specific reporting and /or monitoring requirements, to be enforced during <br />project implementation, shall be defined prior to final certification of the EIR. The lead agency <br />may delegate reporting or monitoring responsibilities to another public agency or a private entity, <br />which accept such delegation. The lead agency, however, remains responsible for ensuring that <br />implementation or the mitigation measures occur in accordance with the program. <br />The mitigation monitoring and reporting program table below lists mitigation measures that arc <br />required to reduce the significant effects of the proposed project. To ensure that the mitigation <br />measures are properly implementer(, the mitigation monitoring and reporting program provide the <br />following information: <br />• Mitigation Measure(s): The action(s) that will be taken to reduce the impact to a less - <br />than-significant level. <br />• Implementation, Monitoring, and Reporting Action: The appropriate steps to <br />implement and document compliance with the mitigation measures. <br />• Responsibility: The agency or private entity responsible for ensuring implementation of <br />the mitigation measure. However; until the mitigation measures arc completed, the City <br />of Santa Aria, as the CEQA Lead Agency, remains responsible for ensuring that <br />implementation of the mitigation measures occur in accordance with the mitigation <br />monitoring and reportingprogram (CEQA Guidelines, Section 15097(a)). <br />• Monitoring Phase: The general timing for conducting each monitoring task. <br />_ EXHIBIT 17 <br />The Heritage Mixed Use Pmjeel 4 -1 T ESA 1140780 <br />Final EnWm.wtal impact Repert Soptember 2015 <br />75A -95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.