My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS, INC. 15 - 2015
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS, INC. 15 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 5:32:36 PM
Creation date
2/25/2016 8:56:53 AM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS, INC.
Contract #
A-2015-277
Agency
POLICE
Council Approval Date
12/1/2015
Expiration Date
11/30/2016
Insurance Exp Date
1/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMEN �y y`, Michael iet Enterprise Flccount Executive <br />Southern California <br />Clarifications 'i Notes, <br />■ Siemens assumes AutoCAD backgrounds shall be provided for engineering purposes. Siemens <br />to provide a block architecture diagram, floor plans and logical network diagram as part of <br />engineering package. <br />• Siemens has excluded costs for scissor lifts within the jail mods. Siemens will provide outdoor <br />lift, if required, for rear yard installation. <br />• Siemens excludes all patch and paint required by removal of existing cameras. <br />Siemens <br />Siemens pricing assumes execution of work during normal business hours. <br />• Siemens scope of work excludes temporary power and lighting. <br />• One Year Warranty on Parts and Workmanship and equipment supplied and installed by <br />Siemens. All existing equipment, wiring and hardware /software not supplied by Siemens is <br />excluded from the limited warranty. <br />• Dedicated 110v power shall be provided by the client for connection to by Siemens. Siemens <br />will require access to 110v circuits at each IDF location within the Jail. <br />• Siemens excludes all fiber and assumes existing fiber shall he utilized for this project. Where <br />existing fiber is absent or in poor operational condition, additional charges may apply. <br />All camera equipment specified shall be Axis Communications. <br />• All network equipment specified shall be Cisco. Siemens to mount and terminate network <br />backbone appliances. Siemens excludes all programming and configuration. It is assumed that <br />the City of Santa Ana IT Department shall provide all network configuration and management. <br />Siemens to coordinate and assist. <br />All equipment not itemized on detailed bill of materials will be at additional cost. Siemens has <br />provided equipment based on submittals and drawings. Locations or devices not indicated on <br />drawings will be at additional cost, <br />• Siemens Industry, Inc. Terms and Conditions apply. <br />Siemens requires signed agreement or acceptable client Purchase Order, prior to all work <br />commencement, including parts acquisition or project mobilization. <br />SOW Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.