Laserfiche WebLink
120 <br />i. <br />, , 617199 <br />OFFSITE- Schedule A <br />Mate r Del High Schoai Offslte Improvements <br />City Project NO. '1616 <br />Canstruction Cost Estimate <br />EXHIBIT "R" <br />CONSTRUCTION COST ESTIMATE <br />75D -74 <br />CITY OF SANTA ANA <br />Item <br />No. <br />Item <br />Unit of <br />Measure <br />Estimated <br />Quantity I <br />)tern Price <br />(in figures) <br />Total <br />(in figures) <br />STREET IMPROVEMENTS <br />1 <br />Clearing & Grubbing <br />LS <br />1 <br />$72,408 <br />$72,408 <br />2 <br />Unclassified Excavation (IncludesAC and PCC Pavement) <br />CY <br />1,180 <br />$35 <br />$41,300 <br />3 <br />Construct -Asphalt concrete Pavement <br />TON <br />578 <br />$51 <br />$29,478 <br />4 <br />Construct PCC Curb and Gutter <br />LF <br />825 <br />$16 <br />$19,200 <br />6 <br />Construct 4" PCC Sidewalk <br />SF <br />8,542 <br />$8 <br />$68,336 <br />61 <br />Construct Driveway Approaoh <br />SF <br />420 <br />$8 <br />$3,360 <br />7 <br />Adjust Manhole 10 Grade <br />EA <br />5 <br />$339 <br />$1,695 <br />8 <br />AdjustValve Box and Cover to Grade <br />EA <br />5 <br />$198 <br />$990 <br />9 <br />Signing, Striping, Marking <br />LS <br />1 <br />$5,650 <br />$5A50 <br />10 <br />Baker @ Eelinger Signal Modification <br />LS <br />1 <br />$129,950 <br />$129,950 <br />11 <br />Landscape and Irrigation Repair <br />LS <br />1 <br />52,825 <br />$2,825 <br />DRAINAGE IMPROVEMENTS <br />12 <br />Construct 3.5' Curb Opening C.B, per CSA Std. 309 <br />1 EA <br />2 <br />$5.085 <br />$10,170 <br />13 <br />Construct 7.0' Curb Opening C.B, per GSA Std, 303 <br />EA <br />1 <br />$6,216 <br />$6,215 <br />14 <br />Construct Parkway Culvert per APWA Std, 151-1 <br />EA <br />2 <br />$2,260 <br />$4,52° <br />15 <br />Construct C.B, /Parkway Culvert per APWA Std. 314 -2 <br />EA <br />1 <br />$5,085 <br />$5108. <br />16 <br />Construct 24" RCP <br />LF <br />305 <br />$90 <br />$27,450 <br />17 <br />Construct 18" RCP <br />LF <br />410 <br />$79 <br />$32,390 <br />18 <br />Construct 19 "X30 " Elliptical RCP <br />LF <br />95 <br />$136 <br />$12,920 <br />19 <br />Construct Junction Chamber per C SA Sid. 306 <br />EA <br />2 <br />$3,390 <br />56,780 <br />20 <br />Construct Transition Structure per iAPWA'Sid. 340 -1 <br />EA <br />1 <br />$2,625 <br />$2,825 <br />21 <br />ConstructCCncrete Encasementll.Itllity PCC Bridge <br />LF <br />150 <br />$281 <br />$4.200 <br />Sub -Total $481,747 <br />Contingency $68,253 <br />Total Estimated Cost $550,000 <br />EXHIBIT "R" <br />CONSTRUCTION COST ESTIMATE <br />75D -74 <br />