My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS INDUSTRY, INC. 15A -2016
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS INDUSTRY, INC. 15A -2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 2:03:45 PM
Creation date
5/31/2016 2:27:34 PM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS INDUSTRY, INC.
Contract #
A-2016-054
Agency
POLICE
Council Approval Date
4/5/2016
Expiration Date
11/30/2016
Insurance Exp Date
10/1/2017
Destruction Year
2021
Notes
a-2015-277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />January 29, 2016 <br />City of Santa Ana <br />Santa Ana, California 92701 <br />Project Name: SAPD Loading Dock Camera Additions <br />Michael Dietsch <br />Enterprise Account Executive <br />Southern California <br />Objectives: <br />• Provide additional video coverage to loading dock area at Santa Ana Police Department <br />1. Siemens to furnish and install a new Axis Q3505 outdoor HD cameras for installation at the <br />loading dock. <br />2. Siemens to provide and install CAT6 cabling and include in expanded video security systems. <br />3. Siemens to provide any necessary conduits for the additional camera locations. <br />4. Siemens to provide design drawings for approval prior to installation. <br />Four (4) <br />Axis Q3505 <br />Four (4) <br />Milestone Licenses <br />Lot <br />Cable, Connectors, Misc. Materials <br />Lot <br />Conduit (NTE 2001ft) <br />Siemens include Prevailing Wage rates. <br />Siemens requires signed agreement or acceptable client Purchase Order, prior to all work <br />commencement, including parts acquisition or project mobilization. <br />All equipment not itemized on detailed bill of materials will be at additional cost. Siemens has <br />provided equipment based on submittals and drawings. Locations or devices not indicated on <br />drawings will be at additional cost. <br />Respectfully <br />Iffilishol it reGrek t7y,ruawry 29, 2076 <br />Michael Dietsch <br />SIEMENS industry, Inc. <br />SOW Page I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.