Laserfiche WebLink
The Consultant shall be able to assist the City through this contract to provide the necessary services. <br />The Consultant shall utilize in-house staff and/or sub -consultants to complete the assignments to meet <br />the City standards. For specialized work for which the prime consultant shall require a sub - <br />consultant, the prime consultant shall serve as an administrative liaison between the City and the <br />sub -consultant. The prime Consultant mark-up for sub -consultants shall not exceed 10%. <br />II. PROPOSED SCOPE OF SERVICES <br />In general, the Consultant shall perform above noted engineering design services resulting in contract <br />documents (plans, specifications and cost estimates "PS&E") for various projects on an as -needed basis. <br />However, work tasks may include studies or a variety of engineering or other tasks. If requested by the <br />City, the Consultant shall provide a Work Plan which includes a detailed schedule of the assigned <br />project prior to the issuance of Notice to Proceed of that particular project and/or Task Order. Specific <br />Task Orders with Notices to Proceed ("NTPs") will be provided for project(s) at the discretion of the <br />City. Work required per Task Order shall comply with the Scope of Services and additional provisions <br />in each Task Order and this agreement. The Consultant shall also provide all field survey work required <br />as appropriate and shall have the necessary experience and required civil, traffic, electrical, structural, <br />geotechnical, surveying, landscape architect and architectural licenses for those in responsible -charge of <br />the work being completed. <br />The Consultant's services for PS&E engineering project preparation shall include, but not be limited to, <br />the following: <br />1. Research existing records of utility companies and agencies and coordinate the proposed <br />improvements with existing field conditions. <br />2. Provide all field survey and topographic work necessary to complete the design effort. Design level <br />survey and base mapping of the project site shall be prepared in US Customary English units by a <br />California licensed Land Surveyor in accordance with the City guidelines and in Microstation V8i <br />Computer Aided Design and Drafting (CADD) format. The horizontal datum shall be NAD 83 and <br />the vertical datum shall be NAVD 88. All survey field notes shall be on forms provided by the City, <br />shall be neatly completed in pencil, and shall become property of the City upon completion of the <br />project. Informal field investigations including marking of removal areas may be required for some <br />of the sidewalk, curb and gutter, and pavement replacement projects. <br />3. Complete the design of projects including plans, specifications, and engineer's construction cost <br />estimate. The Consultant shall contact manufacturers and/or contractors to verify the engineer's <br />estimate prior to submitting to the City. Specifications shall be prepared in Microsoft Word and an <br />electronic copy of the final version shall be furnished to the City. The City will provide the <br />specification boiler plate to the Consultant. <br />4. If requested, all preliminary and bid sets of plans shall be plotted on bond or velum using the <br />Microstation V8i CADD program. All drawings shall be completed per the City of Santa Ana <br />CADD Standards. For interim submittals, the City may opt to receive only PDP versions of the <br />plans for reviewing purposes. If so, the Consultant team will provided plans and/or specifications <br />accordingly. <br />City of Santa Ana Scope of Work <br />Page 2 <br />