Laserfiche WebLink
Finn must use this form to describe the recommended equipment and provide the cost of each unit in the following <br />table. <br />Maintenance Equipment: <br />Description <br />of Equipment <br />Unit <br />Quantity <br />Cost/Unit <br />Total <br />The fee proposal will be opened and reviewed concurrently with the proposal, and weighted per the percentage <br />identified in "I. GENERAL". <br />City Responsibilities: <br />The City will be responsible for providing As -Built plans and project information such as copies of available <br />plans and existing documentation on file relating to the Dan Young Soccer Fields. <br />Manufacturing and Product Specifications Submittals: <br />Include Manufacturer's specifications for materials and installation including but not limited to height of <br />exposed fiber, depth of infill, physical properties of infill, weight of infill, designated proportions of infill, <br />seaming method, and installation methods. <br />Include a currently valid certificate of compliance for the approved synthetic turf system from an independent <br />laboratory such as Testing Services, Inc of Dalton, GA (706-226-1400) or other laboratory, pre -approved by the <br />City, showing the following data: <br />A. Pile Height, Face or Pile Weight and Total Fabric Weight, ASTM D5823 or D5848 <br />B. Total Backing Weight, ASTM D5848 <br />C. Grab Tear Strength, ASTM D5034 <br />Provide the following materials or data (per each product if submitting multiple options): <br />(1) One (1) boxed fabric samples infilled to the proper depth. (Label clearly the name and specifications of <br />material submitted) <br />(2) One (1) fabric only samples, minimum approximately 18" by 24" with seam joint, backing and <br />perforations and a tufted -in white and yellow stripes, 4 -inches wide. (Label clearly the name and specifications <br />of material submitted) <br />City of Santa Ana RFP 16-01 <br />Page 13 <br />