Laserfiche WebLink
EXHIBIT 10 -E SAMPLE COST PROPOSAL (EXAMPLE #3) <br />COST PER UNfF OF WORK CONTRACTS <br />(GEOTECHNICAL AND MATERIAL TESTING) <br />Consultant IDS Group, Inc. Contract No. <br />Unit/liem of Work: <br />(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study) <br />Include as many Items as necessary. <br />DIRECT LABOR Hours Plourly Total (s) <br />Billing <br />Rate ($) <br />Professional (Classification) $0.00 <br />Sub-professional/ Technical* $0.00 <br />EQUIPMENT (with Operator) $0.00 <br />OTHER DIRBCT COST <br />Unis) <br />Unit Cost <br />Description <br />$0.00 <br />$0.00 <br />Mobilization /De- mobilization <br />$0.00 <br />$0.00 <br />Travel /Mileage <br />$0.00 <br />$0.00 <br />Report (if applicable) <br />$0.00 <br />$0.00 <br />TOTAL COST PER UNIT OF WORK <br />$0.00 <br />Date: <br />• Denote labor subject to prevailing wage with asterisic ( *). <br />• Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to all clients <br />(Commercial, Private or Public). <br />• Hourly billing rates include hourly wage rate, net fee /profit, indirect cost rate, and actual direct equipment rate. <br />• Mobilization/De- mobilization is based on site location and number and frequency of tests /items. <br />• ODC items should be based on actual costs and supported by historical data and other documentation. <br />O ODC items that would be considered "tools of the trade" are not reimbursable. <br />25C -63 <br />