Laserfiche WebLink
Section 5 <br />Alternative 2: Proposed Project <br />Centennial Park <br />Under Alternative 2, the proposed injection wells and associated pipelines would <br />be located below ground. Therefore, there would riot be any long term visual <br />changes to areas where the injection wells and pipelines would be constructed. <br />The two proposed shared recreation/communication structures at Centennial <br />Park would mimic the existing structures at the park and would be consistent with <br />the park's existing visual character- No long term adverse changes to the existing <br />visual character at Centennial Park would occur. <br />The construction activities for the Proposed Project would temporary disrupt the <br />park like setting where the construction activity would occur. The construction <br />activity would occur in isolated areas at Centennial Park for short periods of time <br />and would riot adversely change the park's overall visual character. Potential <br />adverse short-term construction impacts to the existing character at Centennial <br />Park would be less than significant, <br />Heritage Museum <br />The proposed monitoring well would be located underground within an existing <br />parking area. The presence of the monitoring well's metal cover and concrete <br />apron would not result in significant long-term adverse changes to the visual <br />character of the Heritage Museum. <br />The construction activities for the monitoring well would temporary disrupt the <br />park like setting at the Heritage Museum site. The construction activity would <br />within an existing parking lot that and would be isolated from the aesthetic <br />resources at the Heritage Museum site, The construction activity would not <br />substantially change the overall visual character at the Heritage Museum. <br />Potential short-term construction related adverse impacts to the existing <br />character of Heritage Museum would be less than significant. <br />Alternative 3: Reduced Intensity Alternative <br />Under Alternative 3, three injection wells would be constructed at Centennial <br />Park and an above ground monitoring well would be constructed at the Heritage <br />Museum, The level of potential long term impacts to the visual character at <br />Centennial Park and at the Heritage Museum would be similar to the Proposed <br />Project. Potential long term adverse changes to the existing visual character at <br />Centennial Park and at the Heritage Museum would be less than significant. <br />Under Alternative 3, one less injection well would be constructed at Centennial <br />Park. Therefore, there will be less amount of construction activity occurring at <br />Centennial Park. The reduced amount of construction activity would not <br />Mid Basin Centennial Park 28ce-noffi Project Final EIR 5-12 <br />