Laserfiche WebLink
Section 5 <br />9 <br />North Centennial <br />52.1 <br />537 <br />1.8 <br />55. <br />Education Center <br />10- <br />Southeast Centennial <br />49.2 <br />49,2 <br />0,10 <br />50,0 <br />Education Center <br />11 <br />Single Family east <br />66,7 <br />667 <br />0,10 <br />69,7 <br />Fairview Street <br />12 <br />Single Family east <br />- <br />66.3 <br />6- <br />6.3 <br />0. -0 <br />-6-9.3 <br />Fairview Street <br />73- <br />Single Family east <br />663 <br />66,3 <br />0.0 <br />69.3 <br />Fairview Street <br />14 <br />Single Family east <br />66,3 <br />66.3 <br />Q,() <br />69.3 <br />Fairview Street <br />15 <br />North Godinez High <br />48.4 <br />48.4 <br />0.0 <br />50,0 <br />School <br />16 <br />Northwest M -tchell <br />37.4 <br />37.6 <br />0.2 <br />50.0 <br />School <br />17 <br />North Heritage <br />42.9 <br />43.2 <br />0.3 <br />50.0 <br />Museum Structure <br />18 <br />South Godinez High <br />382 <br />38.2 <br />0.0 <br />50.0 <br />School <br />19 <br />Northwest Goclinez <br />35.3 <br />359 <br />0.1 <br />50.0 <br />l=Cily Noise 51andard ar Ambien I Noise level 3 dB WhIn Exisomg Noise Levels Above Cily Sian dwd <br />Bold =E.c.,,J5 N01$F,H Strt ... Jad Thoeshnlci <br />With the construction of the sound walls the construction activities would result in <br />noise levels that would range from a 0.1 dB increase to a 1.7 dB increase. As <br />shown in Table 78, the construction activities would not exceed the City's night <br />time noise standard. Potential noise impacts would be less than signifiicant. <br />Phase 7 Construction Activities <br />Under Alternative 3 the project would include well equipping at MBI-4 without <br />concurrent well equipping at MBI-2. All well equipping activities Would occur <br />during the day. The noise levels created during the well equipping at MBl-4 are <br />shown in Table 79, <br />Table 79: Ml Well Equipping Day Time Noise levels <br />Receiver <br />Descill <br />Existing <br />ll Isting, + <br />increase ' <br />Threshold <br />I <br />Multi Family west Santa <br />41,8 <br />41.11 <br />C 0 <br />55,0 <br />Ana River <br />2 <br />Multi Family west Santa <br />61,9 <br />62.0 <br />01 <br />64.9 <br />Ana River <br />3 <br />Single Family north <br />65.6 <br />65.6 <br />0.0 <br />68,6 <br />Edinger Ave. <br />-- <br />4 <br />Single Family -milynort <br />64.4 <br />64.4 <br />01.0 <br />87,6 <br />Mid Basin Centennial Park Injection Well Project Final EIR 5-207 <br />256 -308 <br />