My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
moire, k` <br />M01I1 i► Hi7• 61114 C7111 101 Lis ONW11 <br />This Federal Consultation Review has been prepared to supplement the <br />Environmental Impact Report/Environmental Assessment prepared for the Mid <br />Basin Centennial Park Injection Well Project to meet requirements established by <br />the U.S. Environmental Protection Agency for the State Revolving Loan Program <br />administered by the State Water Resources Control Board, The analysis <br />incorporates by reference technical Studies prepared for the Mid Basin <br />Centennial Park Injection Well Project Environmental Impact <br />Report/Environmental Assessment. <br />8.2 Project <br />The Proposed Project involves the construction of four underground injection <br />wells at Centennial Park and a below ground monitoring well at the Heritage <br />Museum. The water supply to the injection wells would be recycled water from <br />OCWD GWRS water treatment plant in Fountain Valley. An underground pipeline <br />would be constructed that would extend from the GWRS water supply pipeline to <br />Centennial Park and then would branch off to the four injection well sites. When <br />in operation the four injection wells would provide up to 12 MGD of additional <br />groundwater recharge capacity to the Orange County Groundwater Basin. To <br />monitor water quality in the area, a monitoring well has been proposed at the <br />Heritage Museum. <br />The Centennial Park Injection Wells project involves six construction activities. <br />These activities include: <br />• Construction of Water Supply Pipeline <br />• Construction of Back Flush Pipeline <br />• Drilling and Construction of Injection Wells at Centennial Park <br />• Construction of Power and Communication Systems <br />• Repaving of Centennial Park Parking Lot <br />• Site Improvements and Drilling and Construction of a Monitoring Well at <br />Heritage Museum <br />Construction of Water Supply Pipeline <br />Each of the four injection wells would require a pipeline connection to deliver <br />water to the injection well. The source of the water for the injection wells would <br />be the OCWD GWR System pipeline located in the western levee of the Santa <br />Ana River, To access the GRWS pipeline, the western levee would have to be <br />Q Mid Basin Centennial Park lnjgc on dll Project Final EIR 8-1 <br />-04 2 6 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.