Laserfiche WebLink
Section 2 <br />The above language has been clarified and revised as follows; <br />Monthly, the monitoring_ well at the Heritage Museum site would be back flushed <br />as part of the sampling activities. An average of 4,000 or 5,000 gallons of water <br />would either be containerized or discharged in the local storm water system and <br />then into the Greenville- Bannina Flood Control Channel. <br />6. Appendix G preliminary Non - Priority Project Water Quality Plan <br />The Preliminary Non - Priority Project Water Quality Plan, Page 13, Worksheet <br />Runoff Coefficient C <br />As shown in Attachment 1, the worksheet on Page 13 of the Preliminary Non - <br />Priority Project Water Quality Plan has been clarified and revised to reflect a <br />runoff coefficient of .90, <br />OCWD Mid Basin Centennial Park Injection Well Project Draft CIR <br />Response to Comments /Mitigation Monitoring Program 2 -2 <br />25C -389 <br />