My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />SECTION 4.0 MITIGATION MONITORING PROGRAM <br />4.1 Introduction <br />The following is a Mitigation Monitoring Report Program (MMRP) for the Orange County <br />Water District Mid Basin Centennial Park Injection Well Project prepared pursuant to <br />Section 15097 of the CEQA Guidelines and Section 21081.6 of the Public Resources <br />Code. This MMRP lists all applicable mitigation measures from the Draft Environmental <br />Impact Report for the Orange County Water District Mid Basin Centennial Park Injection <br />Well Project. The appropriate timing of implementation and responsible party are <br />identified to ensure proper enforcement of the mitigation measures from the Draft EIR. <br />4.2 Project Description <br />Project Location <br />The Centennial Park project site is located at 300 West Edinger Avenue and the <br />Heritage Park project site is located at 3101 West Harvard Street within the City of <br />Santa Ana. <br />Project Description <br />The Project involves the construction and operation of four injection wells and a single <br />monitoring well. <br />Project Objectives <br />Implementation of the Mid Basin Centennial Park Injection Well Project is intended to <br />achieve the following objectives; <br />• Construct the Mid Basin Centennial Park Injection Well Project in location that <br />can readily tie into the existing GWR System pipeline with minimal impacts to the <br />environment. <br />• Provide 12 MGD per day of additional groundwater recharge capacity to the <br />Orange County Groundwater Basin. <br />• Maximize the use of GWR System as the local water supply to replenish the <br />Orange County Groundwater Basin. <br />• Ensure that the operation of the Mid Basin Centennial Park Injection Well Project <br />does not result in permanent loss of usable open space. <br />• Ensure that during construction and operation of the Mid Basin Centennial Park <br />Injection Well Project safety conflicts with students from Godinez High School, <br />Mitchell Child Development Center and from Centennial Education and Day Care <br />Center are avoided. <br />OCWD Mid Basin Centennial Park Injection Well Project Draft EIR <br />Response to Comments /Mitigation Monitoring Program 4 -1 <br />25C -399 <br />
The URL can be used to link to this page
Your browser does not support the video tag.