Laserfiche WebLink
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vincente Sarmiento <br />COUNCILMEMBERS <br />Angelico Arnezcuar <br />P, David Bwavides <br />Michele Martinez <br />Roman Reyna <br />Sal noijaro <br />April 21, 2016 <br />ADDENDUM No. ONE <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. BOX 1988 <br />Santa Ana, California 92702 <br />C(f Y MANAGER <br />David Cavazos <br />CITY ATI ORNEY <br />Sonia R. Carvano <br />CLERK OF THE COUNCIL <br />Marro D. Huizar <br />The following changes have been made to the specifications of the subject project: <br />Specifications <br />1. Appendix H, Scope of Work, Contractor Responsibilities, Bullet Point 4: <br />Delete bullet point 4 "Contractor shall provide OCTA signage during construction, as shown <br />in Appendix E" <br />2. Appendix H, Concept Drawing Keyed Note #9: Revise note to read as follows: <br />"LED Strip Lighting: Install minimum one X-0" long strip per bay to provide minimum two (2) <br />footcandle light level around shelter. This level can be inclusive of existing nearby street <br />lighting. Light operation will be from dusk until dawn. " <br />3, Appendix H, Concept Drawing Keyed Note #12: Revise note to read as follows: <br />"Solar Panel, to power LED strip lighting. System shall have minimum 5 days autonomy, <br />shall be sized for the shortest day of the year, and shall be UL listed." <br />4. Appendix 1-1, Concept Drawing Keyed Note #14: Append to note the following: <br />"Lighting for Advertisement Case to be solar powered." <br />All other terms and conditions remain the same. <br />- - --N <br />FOR THE CITY P�SANJ-A ANA <br />C— <br />r. <br />Edwin "William" Galvez <br />City Engineer <br />Public Works Agency <br />