Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the <br />proposed work, that they have examined the Contract Documents in its entirety and hereby <br />proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any) and the specifications far the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />itean <br />Description <br />t <br />City of <br />Santa Ana <br />Traffic Signal Modification at Harbor Blvd <br />I <br />Ls <br />and 5th St <br />L <br />Install Type 334 Communication Cabinet <br />I <br />LS <br />$ <br />Assembly <br />3 <br />Install 2" PVC Conduit <br />530 <br />LF <br />$ <br />4 <br />Install 3" PVC Conduit <br />3200 <br />LF <br />$ 3 <br />s) <br />5 <br />install 4" PVC Conduit <br />to <br />LF <br />6 <br />Install No. 6 Pullbox <br />16 <br />EA <br />14 <br />7 <br />Install No. ISE Pullbox <br />3 <br />EA <br />B <br />Install Type E Loop Detector <br />28 <br />EA <br />bo <br />9 <br />Install Detector Lead-in Cable <br />16120 <br />LF <br />10 <br />Replace Pedestrian Head Assembly with <br />Countdown Head <br />32 <br />EA <br />ME <br />