My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ASPLUNDH CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:10:03 PM
Creation date
7/28/2016 3:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION CORP.
Contract #
15-6828
Agency
Public Works
Council Approval Date
4/19/2016
Expiration Date
12/22/2017
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. IS -6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />Item <br />Description <br />Qty <br />unit <br />Unit Price <br />Amount <br />43 <br />Furnish and install UPS Cabinet and UPS <br />R <br />EA <br />#r /] <br />aZS <br />$ 2 <br />assembly <br />] <br />o <br />44 <br />Relocate existing traffic signal controller <br />6 <br />EA <br />/% /r o <br />$ fo <br />pU0 �J �/�/j <br />$ <br />assembly 4a new controller rahinet <br />e Tf°'�•00 <br />45 <br />Furnish and Install new CCTV camera <br />YO <br />EA <br />in <br />$'aY 00. <br />/ ®„ <br />$ -41 pOD. <br />system <br />45 <br />Remove and salvage existing CCTV camera <br />i <br />EA <br />$ 6 �• �.- <br />$ <br />47 <br />Furnish and Install new pedestrian push <br />76 <br />EA <br />$ g/ <br />$ <br />button assembly <br />48 <br />Furnish and Install new pedestrian <br />58 <br />EA <br />$ vd <br />I,pt�ygfg, dt3 <br />countdown module <br />49 <br />Remove existing pull box and Fundsh and <br />Y <br />EA <br />$ I <br />v �• <br />$ <br />install NGE Full Box <br />,�00.'' <br />i��0, <br />5U <br />Remove existing pull bort and Furnish and <br />2 <br />EA <br />$ � <br />Install 45 Pull Box <br />. <br />r <br />f� <br />51 <br />Furnish and Install ME Pull -Box <br />5 <br />EA <br />$ -1 '7✓, � <br />$ /4I S7 S, <br />52 <br />Furnish and Install 45 pull -Box <br />3 <br />EA <br />$ � , w�` <br />o <br />$ <br />53 <br />Furnish and Install new 3" Conduit <br />1175 <br />LF <br />'0,tl� <br />54 <br />Remove existing SIC Cable <br />SUN <br />Lf <br />$ <br />55 <br />Furnish and Instal[ ai Strand SMFC7 Cable <br />795 <br />LF <br />$J0 <br />$ <br />56 <br />Furnish and Install 24 Strand SMFO Cable <br />4110 <br />LF <br />$ � ,�i' <br />0 <br />$ I D, <br />57 <br />Furnish and Install Splice Enclosure In 46C <br />pull box. Fusion splice and terminate all <br />8 <br />EA <br />a� <br />$ 1� 3v(7,' <br />$ <br />fibers erfiberschemavc. <br />58 <br />Fusion splice and terminate new fibers in <br />2 _ <br />EA <br />rp <br />g r}u <br />existing splice canister per fiber schematic <br />59 <br />Terminate hoar drop cable in fiber patch <br />3 <br />EA <br />$�f�l��.ti <br />panel <br />6U <br />Terminate fiber c istriirutian cable In fiber <br />1 <br />EA <br />$' <br />patch penal <br />BP -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.