Laserfiche WebLink
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vincent F. Sarmiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. David Benavides <br />Michele Martinez <br />Roman Reyna <br />Sal Tinajero <br />November 24, 2015 <br />ADDENDUM No. Two <br />CITY OF SANTA ANA <br />20 Civic Center Plaza . P.O. Box '1988, M-43 <br />Santa Ana, California 92702. <br />(714)647-5019 <br />www Santa-ana ora <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT: PROJECT No. 15-6830: Pedestrian Countdown Heads and Push <br />Buttons <br />The following clarifications have been made to the subject project: <br />1) What are the acceptable methods for patching the visible holes on the signal pole <br />as a result of the removal or relocation of the existing pedestrian push button <br />assembly? <br />The acceptable method is to install a Steel Knockout Seal with Screw Bar <br />or Snap -in Steel Knockout Seal. <br />2) Is it allowable to install the new 3 conductor cable in existing conduit without <br />removing existing conductors? <br />Yes, the new 3 conductor signal cable may be installed without removing <br />other conductors. <br />All other terms and conditions remain the same. <br />FOR THE CITY OF SANTA ANA <br />f �1 in "William" Galvez, P.E. <br />v. <br />City Engineer <br />SANTA ANA CITY COUNCIL <br />Miguel A-Pulido vincenf F. Sarmiento Michele. Martinez An9alica Amezrue P- Devid Banevides Roman Rayna Sal nna,aro <br />Mayor Mayor Pm Tem, Ward 1 Ward Wa,d3 Ward WartlS Ward6 <br />msulitlo(aJsanla-ana on vaanniento(NSanfa-ana om mmarlineiC�Jsan4a-ana orq aamezcua(Nsai�fa-ana,orq dhenavides_Qsanta-ana ort rre na sanfaana orq slinaieroLsanlB-ana oy <br />