Laserfiche WebLink
CITY OF SANTA ANA ADDENDUM NO. ONE <br />PROJECT NO. 15-6606 <br />PROPOSAL Exhibit A <br />PROJECT NO. 15-6606: 3R° STREET TRAFFIC CALMING (FAID# U58DP0o5861) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />P <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />Cy <br />80 <br />$ <br />$�fU�it <br />DDr <br />L q �r <br />2 <br />AC Pavement* <br />TN <br />55 <br />$ <br />ir7 <br />3 <br />ConstruetPCC Sidewalk (T-4")* <br />SF <br />825 <br />$ <br />4 <br />Construct PCC Curb Rantp* <br />SF <br />1140 <br />$ d <br />$ <br />S <br />Construct PCC Driveway (T=G")* <br />—Sr <br />45 <br />$ <br />$ <br />6i®b <br />6 <br />Conshuct PCC Curb only (B -I )* <br />LF <br />260 <br />$ <br />$ <br />5jb' <br />7 <br />Cotuhvct PCC Curb and Gutter (A-2.6)* <br />LF <br />50 <br />$ <br />$ <br />R <br />Construct AC DIl(E Traffic Circle(Curb <br />LF <br />65 <br />$ <br />$ <br />Face = G') <br />9 <br />Cousn•uci and Provide Bdek Paver Band* <br />SF <br />70 <br />$ <br />✓ <br />10 <br />A j ust Manhole Frame utd Cover to Oracle <br />EA <br />$ <br />$ <br />I 1 <br />Adjust Water Valve Frame and Cover to <br />EA <br />1 <br />$ <br />Grade <br />tP O <br />b6 <br />I <br />Adjust Pull Box to Grade <br />EA <br />1 <br />$ <br />$ <br />Wo <br />(goo - <br />13 <br />Landscaping <br />LS <br />1 <br />$ <br />$ <br />176600 <br />0®60— <br />14 <br />Landscape Maintenance (60 calendar <br />LS <br />1 <br />$ <br />$ <br />days): <br />451b – <br />%06 — <br />15 <br />Furnish and Install Soil* <br />CY <br />20 <br />$ <br />$ .' <br />P-1 of P-18 <br />