My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PALP INC. DBA EXCEL PAVING COMPANY (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PALP INC. DBA EXCEL PAVING COMPANY (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 5:21:26 PM
Creation date
7/28/2016 3:45:50 PM
Metadata
Fields
Template:
Contracts
Company Name
PALP INC. DBA EXCEL PAVING COMPANY
Contract #
15-6606
Agency
Public Works
Council Approval Date
5/17/2016
Expiration Date
10/31/2016
Destruction Year
2016
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. ONE <br />CITY OF SANTA ANA PROJECT NO, 15-6606 <br />PROPOSAL <br />PROJECT NO. 15-6606: 3" STREET TRAFFIC CALMING (FAID# U58DP005861) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sums) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />CY <br />80 <br />$ <br />$ <br />2 <br />AC Pavement* <br />TN <br />55 <br />$ <br />$ <br />3 <br />Construct PCC Sidewalk (T=4")* <br />SF <br />825 <br />$ s <br />$ <br />gi23 <br />�V <br />4 <br />Construct PCC Curb Ramp* <br />SF <br />1140 <br />$ <br />$ — <br />5 <br />Construct PCC Driveway (T=6")* <br />SF <br />55 <br />$ <br />$ <br />110b <br />6 <br />Construct PCC Curb only (B-1)* <br />LF <br />260 <br />$ <br />$ <br />45b <br />13bb0' <br />7 <br />Construct PCC Curb and Gutter (A-2-6)* <br />LF <br />50 <br />$ <br />$ <br />p-- <br />c�1)• <br />8 <br />Construct AC DIKE Traffic Circle(Curb <br />LF <br />65 <br />$ <br />$ <br />Face =6")* <br />157.- <br />9 <br />Construct and Provide Brick Paver Band* <br />SF <br />70 <br />$ <br />$ <br />✓T s <br />V <br />10 <br />Adjust Manhole Frame and Cover to Grade <br />EA <br />1 <br />$ <br />$ <br />I 1 <br />Adjust Water Valve Frame and Cover to <br />EA <br />1 <br />$ <br />$ <br />Grade <br />ep 0 — <br />sbb s <br />12 <br />Adjust Pull Box to Grade <br />EA <br />1 <br />$ <br />$ <br />13 <br />Landscaping <br />LS <br />1 <br />$ <br />$ <br />obbb' <br />�ooaD- <br />14 <br />Landscape Maintenance (60 calendar <br />LS <br />1 <br />$ <br />$ <br />days): <br />19b <br />200- <br />v0-15 <br />15 <br />Furnish and Install Soil* <br />CY <br />20 <br />$ ";.� <br />$ 1 i 6 D <br />P -I ofP-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.