Laserfiche WebLink
EXHIBIT C <br />ARTERIAL PAVEMENT MANAGEMENT PROGRAM <br />FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />-P nnal Rdafrh <br />Phase <br />(ENTER <br />SOURCE) <br />(EER,(ENTER= <br />NT <br />SOURCE <br />SOURCE) <br />Other <br />OCTA <br />RSTP , Funding'Total <br />En ineerin <br />$ <br />$ <br />$ - <br />$ - $ - $ <br />Ri ht-of-Wa <br />$ <br />$ <br />$ - <br />$ - $ - $ <br />Construction <br />$ - <br />$ <br />$ <br />$ $ $ <br />Total <br />$ - <br />$ <br />$ <br />$ $ $ <br />Phase v Proposed Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates com fete <br />Start Right -of -Way Acquisition <br />Right -of -Way Certification <br />Read to Advertise <br />Award Construction <br />Project Completion (open for use) <br />r1- <br />Page 1 <br />