My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2016-09-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
09/20/2016
>
FULL PACKET_2016-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 5:57:35 PM
Creation date
9/15/2016 5:35:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/20/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6834 <br />FEDERAL PROJECT N0: HSIPL 5063(156) <br />TRAFFIC SIGNAL MODIFICATIONS: 17TH STREET AT ENGLISH STREET, <br />MACARTHUR BOULEVARD AT PLAZA DRIVE, EDINGER AVENUE AT SULLIVAN <br />STREET, WESTMINSTER AVENUE AT CLINTON STREET <br />EXHIBIT 16-B Local Assistance Procedures Manual <br />Subcontracting Request <br />INSTRUCTIONS FOR COMPLETING SUBCONTRACTING <br />REQUEST FORM <br />All First-tier subcontractors must be included on a <br />subcontrac ting request. <br />Submit in accordance with Section 8-1.01 of the Caltrans Standard Specifications. <br />Type or print requested information. Information copy is to be retained by the <br />contractor. Submit other copies to project's Resident Engineer. After approval, the <br />original will be. returned to the contractor. <br />When an entire item is subcontracted, the value to be shown is the contractor's bid <br />price. When a portion of an item is subcontracted, describe the portion, and show <br />the % of bid item <br />and value. <br />THIS FORM IS NOT TO BE USED FOR <br />SUBSTITUTIONS. <br />Prior to submittal of Form CEM -1201 involving a replacement Subcontractor, <br />submit a separate written request for approval to substitute a listed subcontractor, <br />Section 4107 of the Government Code covers the conditions for substitution, <br />Submit a separate written request for approval of any DBE/MBE/WBE/DVBE <br />substitution. Include appropriate backup information and state what efforts were <br />made to accomplish the same dollar value of work by other certified <br />DBE/M.B E/ W BE/D V BEs. <br />NOTE: For contractors who will be performing work on railroad property, it is necessary <br />for the contractor to complete raid submit the Certificate of Insurance (State Form <br />DH-OS-AIOA) naming the subcontractor as insured. No work shall be allowed <br />which involves encroachment on railroad properly until the specified insurance has <br />been approved. <br />Page 16.52 <br />October 5, 2012 LPP 12 <br />P-36 of P-40 <br />20D-51 <br />Back <br />
The URL can be used to link to this page
Your browser does not support the video tag.