My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2016-09-20
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
09/20/2016
>
FULL PACKET_2016-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2016 5:57:35 PM
Creation date
9/15/2016 5:35:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
9/20/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Viconte Sarmiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. Oavid Benavldes <br />Michele Martinez <br />Ronan Reyna <br />Sal Tinatero <br />July 22, 2016 <br />ADDENDUM FIVE <br />1 OF SANTA ANA <br />20 Civic Center Plaza + P.O. Box 1988 M-30 <br />Santa Ana, California 92702 <br />(714)647-5013 <br />Wy� <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R, Carvalho <br />CLERK Of THE COUNCII. <br />Maria O. Huizar <br />142' fcrG edged <br />Ali Yazdanshenas <br />Arnaz Engineering <br />Contractors, Inc. <br />SUBJECT: PROJECT NO, 11-5412: WALNUT PUMP STATION BUILDING UPGRADE <br />The following changes/clarifications have been made to the specifications of the subject <br />project: <br />1. PROJECT SUBMITTALS <br />Add; Electronic Submittal Platform and Procedure <br />It is the contractor's responsibility and to transmit all shop drawings, data submittals, and <br />project closeout documentation via the City's electronic platform. The general contractor will <br />be required to attend training session/s and or obtain the necessary training on the usage <br />and procedures for all transmittal documentation. <br />a. Submittal Preparation - Contractor may use any or all of the following options: <br />i. Subcontractors and Suppliers provide electronic (PDF) submittals to <br />Contractor via the Submittal Exchange website. <br />ii. Subcontractors and Suppliers provide paper submittals to General <br />Contractor who electronically scans and converts to PDF format. <br />IT Subcontractors and Suppliers provide paper submittals to Scanning <br />Service which electronically scans and converts to PDF format. <br />b. Contractor shall review and apply electronic stamp certifying that the submittal <br />complies with the requirements of the Contract Documents including verification <br />of manufacturer / product, dimensions and coordination of information with other <br />parts of the work. <br />c. Contractor shall transmit each submittal to City using the Submittal Exchange <br />website, www.submittalexchange.com. <br />d. Engineer review comments will be made available on the Submittal Exchange <br />website for downloading. Contractor will receive email notice of completed <br />review. <br />e. Distribution of reviewed submittals to subcontractors and suppliers is the <br />responsibility of the Contractor. <br />23A-34 <br />Sol i e p. <br />Wads <br />�m eCas._ga.anp oo <br />SANTA ANA CITY COUNCIL <br />rated A. lelide <br />Viae'. SiminM <br />Mictrela MaNnea <br />as"WaAreinmo <br />Pnaed Eire.,de, <br />NCman FM,ma <br />Mayor <br />Moyer Pro Tam, Word 1 <br />Wow <br />Werd3 <br />Wa1d.1 <br />Wards <br />nmmlrlioey2 <br />23A-34 <br />Sol i e p. <br />Wads <br />�m eCas._ga.anp oo <br />
The URL can be used to link to this page
Your browser does not support the video tag.