Laserfiche WebLink
SUPPLEMENT TO PROJECT AGREEMENT PAGE 1 <br />PROJECT AGREEMENT FOR BUILDING ENVIRONMENTAL SYSTEMS <br />Proposal Date <br />Proposal Number <br />Page <br />September 27, 2016 <br />CM401480A <br />2 of 2 <br />CONTRACTOR WILL PROVIDE THE FOLLOWING TO CUSTOMER (continued): <br />- Demo and removal of existing equipment platforms, secondary decking <br />- New structural members installed. <br />- Rebuild of secondary decking with new platforms and waterproofing. <br />- Installation of new metal shed. <br />-Inspections. <br />- Additional piping and insulation as required to reconnect equipment. <br />Temperary boiler install and two month rental: $30,594.00 <br />Additional Crane/Rigging work: $5,660.00 <br />Additional piping and city upgrades including isolation: Estimated Material $23,980.00 Labor and <br />fees $24,309.00 = $48,289.00 <br />Structural Work including new metal shed: Estimated Material $7,440.00 Labor and fees <br />$61,432.00 = $68,872.00 <br />Total Cost: $153,415.00 <br />Exclusions: <br />- Any unforseen/Hidden conditions. <br />THE SERVICES DESCRIBED ABOVE ARE GOVERNED BY THE TERMS AND CONDITIONS OF THE PROJECT <br />PROGRAM AS SET FORTH ON THE REVERSE OF THE PROJECT AGREEMENT PAGE 1 <br />22A-6 <br />