Laserfiche WebLink
CITY OF SANTA ANA Exhibit 2 <br />PROPOSAL, <br />PROJECT NO.: 15 -6848 <br />BISHOP- PACIFIC- SHELTON BIKE BLVDS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />famish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />CY <br />1,350 <br />$-i, <br />2 <br />AC Pavement* <br />TN <br />1,'100 <br />$ <br />$ <br />` <br />1)• r <br />3 <br />Crusbed Miscellaneous Base (CMB)* <br />'IN <br />36 <br />$ <br />$ <br />4 <br />Construct PCC Sidewalk ('i' =4 ")* <br />SF <br />13,000 <br />$ <br />$ <br />5 <br />Construct PCC Curb Ramp* <br />SF <br />4,200 <br />$ <br />$ <br />6 <br />Construct PCC Driveway (1' =6 ")* <br />SF <br />310 <br />$ ` <br />$ <br />7 <br />Construct PCC Curb only (B -I )* <br />LF <br />300 <br />$ <br />a <br />13 <br />8 <br />Construct Curb and Gutter * <br />LF <br />2,000 <br />9 <br />Construct PCC. Modified Curb(Traffc <br />SF <br />1,900 <br />$ <br />$ <br />Circle)* <br />D-6.(42 -0 <br />t� <br />10 <br />Construct Color Stamped Concrete <br />SF <br />1,800 <br />$ �� <br />$9�(p(` <br />including rebar (T =10" )* <br />y <br />ry <br />M = <br />11 <br />Construct PCC Cross Gutter (Local)* <br />SF <br />1,200 <br />$ <br />$ <br />12 <br />Adjust Manhole Frame and Cover to Grade <br />EA <br />7 <br />$ <br />$ <br />13 <br />Adjust Water Valve Frame and Cover to <br />EA <br />9 <br />$ <br />$ <br />Grade <br />715, <br />`1 1C,L�.'"'. <br />P -1 of P-18 <br />23B -7 <br />