My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2016-11-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
11/15/2016
>
FULL PACKET_2016-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2016 10:36:42 AM
Creation date
11/14/2016 10:12:50 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
11/15/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1032
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R & S Overhead Doors ol'So -Cal, [tic. <br />1617 N. Orannethorpc Way <br />Anaheim, Ca. 92801 <br />„t�_ Ph: ('714) 237.1990 Fax: (714) 237 -1994 <br />Cont, Lic: No, 756821 <br />trivia, rsdoorservice.co m <br />rfer <br />ncr <br />In this over OFFER <br />shall refer to: <br />City Of Santa Ana <br />Contact: Dave Phone; (714) 220 -5295 <br />R &$ Overhead Doors Proposes to Furnish the Fr <br />*rrbme new 67 wide x 6 ft high fire rated wall in corridor <br />• Studs to be 3 6/8, 20 gauge with 6/8 drywall both sides, taped & make ready <br />for paint <br />• Install conduit & J box with fire pad for card reader & law voltage for hot <br />hinge <br />a f ingludi±.s masking & cleanup of area during construction <br />n (1) 3 -6010 solid wood core door, prefinished clear birch, 60 min. fire rated <br />with frame. Von Duprin 99 panic device with electrified retraction, exterior <br />lever trim ,LCN 4040 door closure and 914 Von Duprin power supply, <br />� Electronic transfer power hinge. <br />R &S proposos to install the above mentioned materials in hall way corridor as per <br />6datomer.request. Grow will perform all work on Friday and weekends for all dry wall and <br />doors could run into the week work, project bid on all trades prevailing wages <br />EXCLUDES: Finish paint, wall paper removal and frame paint. <br />"Price lucludes Tas <br />r, Excludes costs arany previous 5crviee <br />25B -14 <br />No, I oft Pages <br />Offer th NIS -3355 <br />Date: September 20, 2016 <br />6y: Moises Sandoval <br />Email; Nloerssocallr�yahnacam <br />Price <br />
The URL can be used to link to this page
Your browser does not support the video tag.