My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:37:35 PM
Creation date
11/29/2016 11:43:29 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
15-6834
Agency
Public Works
Council Approval Date
9/20/2016
Expiration Date
9/1/2017
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6834 <br />FEDERAL PROJECT NO: HS,IPL 5063(156) <br />TRAFFIC SIGNAL MODIFICATIONS: 17TH STREET AT ENGLISH STREET, <br />MACARTHUR BOULEVARD AT PLAZA DRIVE, EDINGER AVENUE AT SULLIVAN <br />STREET, WESTMINSTER AVENUE AT CLINTON STREET <br />DIFFERING SITE CONDITIONS <br />The undersigned, is submitting this proposal for performing by contract the work required by <br />these bid documents, certify to comply with the following: <br />a. Contractor's Notir1cation <br />Promptly notify the Agency's Engineer if you find either of the following conditions: <br />1. Physical conditions differing materially from either of the following: <br />• Contract docurnents <br />• Job site examination <br />2. Physical conditions of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as <br />inherent in the work provided for in the Contract <br />Include details explaining the information you relied on and the material <br />differences you discovered. If you fail to promptly notify the Engineer, you waive <br />the differing site condition claim for the period between your discovery of the <br />differing site condition and your notification to the Engineer. <br />If you disturb the site after discovery and before the Engineer's investigation, you <br />waive the differing site condition claim. <br />b. Engineer's Investigation and Decision <br />Upon your notification, the Engineer investigates job site conditions and: <br />1. Notifies you whether to resume affected work <br />2. Decides whether the condition differs I i iaterially and is cause for an <br />adjustment of timeflpayhse�nt, or bot <br />Signed <br />Title President <br />Mwinno M1. Una r0Rr6r1F1191T*Tr1T—=71§Nr1� <br />Date 05/04/2016 <br />P-37 of P-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.