My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATRIX ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MATRIX ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:20:35 PM
Creation date
11/29/2016 4:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
MATRIX ENVIRONMENTAL, INC.
Contract #
16-6876
Agency
Public Works
Council Approval Date
8/16/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 16-6876 <br />FORMER YMCA — MATERIALS ABATEMENT AND ENVIRONMENTAL <br />REMEDIATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />j ADDENDUM THREE <br />FROM: t L �j�� Y 11GVt 11 i "hl/���11(l l� (; <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />*Submit a work nlan for Citv annroval phasing. and length of time. <br />Table A: Miscellaneous <br />Item <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Amount <br />1 <br />Mobilization/Demobilization1 <br />(No more than 10% of the total bid Tables A-1-1) <br />LS <br />$r�0"•Q <br />$ ' (T <br />2 <br />Permits <br />1 <br />LS <br />$ 2. _ (�� <br />$ 4610. <br />3 <br />Windows Panes <br />1 <br />LS <br />$3L3iCLo <br />} <br />4 <br />Board Up Windows <br />30 <br />EA <br />$ jam, <br />S <br />Pool Water Analysis, Removal and Disposal and <br />Bottom Cleanup <br />1 <br />LS <br />150 <br />SF <br />6 <br />Drain Cleaning <br />1 <br />LS <br />$ c (7(Xi ,, <br />$ i <br />7 <br />Polyethylene Sheathing Around Scaffolding <br />1 <br />LS <br />$2j'47 <br />_$ 0 <br />8 <br />Building Security <br />1 <br />LS <br />s9 a .` <br />$mea O <br />Total Items 1-8: <br />$ <br />R& <br />Table B: Asbestos Abatement <br />Item <br />Location <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Amount <br />Main Building <br />9 <br />Roof (includes all levels <br />Rolled mofmg fields, <br />with asphalt sheeting) <br />felts and associated <br />6000 <br />SF <br />mastics <br />10 <br />Basement throughout walls <br />Mirror Mastic <br />150 <br />SF <br />11 <br />Basement floor at youth <br />shower access to and <br />Blue ceramic the and <br />SF <br />$_ <br />pool <br />mortar/grout <br />$ 'p <br />_ <br />youth restroom <br />75 <br />12 <br />Basement at boiler room <br />Gaskets <br />piping and at I" floor <br />storage at abandoned water <br />3 <br />SF <br />02 <br />$W. <br />heater <br />P-1 of P-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.