My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATRIX ENVIRONMENTAL, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MATRIX ENVIRONMENTAL, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:20:35 PM
Creation date
11/29/2016 4:17:39 PM
Metadata
Fields
Template:
Contracts
Company Name
MATRIX ENVIRONMENTAL, INC.
Contract #
16-6876
Agency
Public Works
Council Approval Date
8/16/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO,: 16-6876 <br />FORMER YMCA -- MATERIALS ABATEMENT AND ENVIRONMENTAL <br />REMEDIATION <br />Table G: Asbestos Containing Materials (Procedure 5 Plan) <br />Item <br />Location <br />Description <br />Quantity <br />Unit <br />Unit <br />Amount <br />Price <br />67 <br />2 Id floor west stair <br />Drywall with joint compound at <br />landing wall build -out <br />ceiling <br />340 <br />SF <br />debris in stairwell <br />$� <br />$ <br />closet <br />68 <br />2" floor restroom <br />Corrugated paper insulation <br />ceiling (debris <br />ceiling deck andd men's <br />} , l I <br />/-� <br />j <br />17 <br />40 <br />SF <br />$ <br />$ C�. <br />and women's shower <br />area) <br />69 <br />2" and 3` floor telling <br />TSI pipe <br />adjacent to restrooms <br />and pipe chase; <br />throughout north <br />central roof area (2"d <br />/3'dlevel <br />roof), north <br />150 <br />LF <br />$ % <br />roof and wall area <br />(north side of gym at <br />2"d and ground level). <br />Debris observed below <br />areas <br />damaged elboor <br />70 <br />cw <br />2" and 3` floeiling <br />Pipe elbows Insulation (and <br />area adjacent to <br />debris) <br />restrooms and pipe <br />chase; throughout <br />north central roof area <br />(2"4 and 3"d level roof), <br />40 <br />BA <br />z V <br />! 5 <br />and north roof and wall <br />$ <br />$ <br />area (north side of gym <br />at 2"d and ground <br />level), Debris observed <br />below damaged elbow <br />areas <br />71 <br />3` floormen'sand <br />Drywallwithjointcompound <br />wornen's restroom <br />(including debris) <br />340 <br />SF <br />? <br />$ <br />$ <br />walls, 3`d floor storage <br />closet ceiling <br />Southwest Building <br />72 <br />Northeast room on <br />Corrugated insulation debris <br />3 <br />SF <br />$ <br />$ <br />floor <br />73 <br />Ceiling/floor <br />Cementitious piping <br />3 <br />SF <br />$' <br />Total Item 5573: <br />$ <br />Table TI: Alternate As Needed) <br />Item <br />Location <br />DescYi tion <br />p <br />Quantity <br />Unit <br />Unit <br />Amount <br />Price <br />74 <br />Roo:F <br />Plywood <br />30 <br />BA <br />$7S <br />Basement <br />LigIndDisposal <br />4 <br />BA$Total <br />ii <br />Item 74-75: <br />- <br />P-5 of P-20 <br />10% <br />M <br />(210 <br />On <br />
The URL can be used to link to this page
Your browser does not support the video tag.