My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2016-12-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
FULL PACKET_2016-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2016 10:25:30 AM
Creation date
12/5/2016 9:49:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/6/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet metal will be protected with rubber grommets. Consultant's wire and cable installations are finalized with <br />OEM grade split loom (where necessary) and grouped securely with wire ties along routing paths. <br />IX. Vehicle Installation Sign Off <br />Once equipment has been installed by Consultant in a City vehicle, the Chief of Police or his designee will review <br />the completed vehicle installation and if done to the City's specifications, will sign off on the vehicle installation <br />in writing. The vehicle inspection shall conduct a visual inspection of the interior and exterior of the vehicle and <br />verifying that installation was done pursuant to the previously provided vehicle specific SOW, wiring plan, and <br />wireless communication test procedure. If City determines that the installation does not meet the City's <br />specifications, City will give written notice to the Consultant. Consultant and City will agree upon a timeline not <br />to exceed two (2) weeks in which to complete the installation to the City's specifications. <br />25C -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.