My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ARNAZ ENGINEERING CONTRACTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 12:22:51 PM
Creation date
12/13/2016 10:58:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
11-6412
Agency
Public Works
Council Approval Date
9/20/2016
Expiration Date
5/19/2020
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />(PROPOSAL Exhibit A <br />PROJECT NO.: 11-6412 <br />WALNUT PUMP STATION BUILDING UPGRADE <br />ADDENDUM TWO <br />Itein <br />Description <br />Qty <br />Unit <br />UnitFrriee <br />Ainount <br />13 <br />Sprinkler Inigation System <br />I <br />LS <br />$ <br />2$,000. <br />28,000. <br />14 <br />Landsoaping <br />1 <br />LS <br />$ <br />35,000. <br />$ <br />35,000. <br />15 <br />Precast Concrete Vaults and Manholes <br />I <br />LS <br />$ <br />$ <br />70,000, <br />70,000. <br />16 <br />Onsite Storinwater Retention and Pollution <br />1 <br />LS <br />$ <br />$ <br />Prevention System <br />35,000, <br />35,000. <br />17 <br />Reinforced Concrete Masonry Unit Pump <br />1 <br />LS <br />$ <br />$ <br />Building <br />820,000 <br />820,000. <br />18 <br />Reinforced Concrete Masonry Unit <br />1 <br />LS <br />$ <br />$ <br />storage Building <br />150,000 <br />150,000. <br />19 <br />Canopy <br />1 <br />LS <br />$ <br />$ <br />80,000. <br />80,000. <br />20 <br />Motorized Rolling Gate <br />t <br />EA <br />$ <br />$ <br />25,000. <br />25,000. <br />21 <br />Instrumentation and Telemetry <br />1 <br />LS <br />$ <br />$ <br />$5,000. <br />85,000. <br />22l6"Mc$;r-AcnuatedButtertly <br />Valves <br />6 <br />BA <br />$ <br />$ <br />15,000. <br />90,000. <br />23 <br />Bridge Crane, Trolley and Hoist Systems <br />1 <br />LS <br />$ <br />40,000. <br />$ <br />"1000. <br />24 <br />Yard Piping andFittings <br />1 <br />L9 <br />$240,000. <br />$240,000.OD. <br />Building Plumbnig Systems and Fire <br />1 <br />1a" <br />$ <br />$ <br />Protection Systems <br />10,000. <br />10,000. <br />Building RVAC Systems <br />1 <br />LS$ <br />$ <br />L�-2 <br />30,000, <br />30,000. <br />Ymd Conduit <br />1 <br />LS <br />$85,000. <br />85,000. <br />Building and Site Electrioal and Lighting <br />I <br />LS <br />$ <br />$ <br />System <br />280,000. <br />280,000. <br />29 <br />VFD Motor Control Center <br />450,000, <br />450,000. <br />30 <br />Automatic Transfer Switch <br />I <br />LS <br />$ <br />$ <br />132 <br />20,000. <br />20,000. <br />31 <br />Excavation Safety Measures <br />1 <br />LS <br />$ <br />$ <br />8,000. <br />8,000. <br />Sodium Hypochlorite Generation Unit <br />I <br />LS <br />$ <br />$ <br />185,000. <br />185,000. <br />P-2 of P-17 <br />ey <br />0,y <br />
The URL can be used to link to this page
Your browser does not support the video tag.