Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11-6412 <br />WALNUT PUMP STATION BUILDING UPGRADE <br />ADDENDUM TWO <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />13 <br />Sprinkler Irrigation System <br />I <br />LS <br />$ <br />$ <br />28,000. <br />28,000. <br />14 <br />Landscaping <br />1 <br />LS <br />$ <br />$ <br />35,000. <br />35,000. <br />15 <br />Precast Concrete Vaults and Manholes <br />1 <br />LS <br />$ <br />$ <br />70,000. <br />70,000. <br />16 <br />Onsite Storrawater Retention and Pollution <br />1 <br />LS <br />$ <br />$ <br />Prevention System <br />35,000. <br />35,000. <br />17 <br />Reinforced Concrete Masonry Unit Pump <br />1 <br />LS <br />$ <br />$ <br />Building <br />820,000 <br />820,000. <br />18 <br />Reinforced Concrete Masonry Unit <br />1 <br />LS <br />$ <br />$ <br />Storage Building <br />150,000 <br />150,000, <br />19 <br />Canopy <br />1 <br />LS <br />$ <br />$ <br />80,000. <br />80,000. <br />20 <br />Motorized Rolling Gate <br />I <br />EA <br />$ <br />$ <br />25,000. <br />25,000. <br />21 <br />Instrumentation and Telemetry <br />I <br />LS <br />$ <br />$ <br />$5,000. <br />$5,000. <br />22 <br />16" Motor -Actuated Butterfly Valves <br />6 <br />EA <br />$15,000. <br />$ <br />90,000. <br />23 <br />Bridge Crane, Trolley and Hoist Systeme <br />I <br />LS <br />$ <br />$ <br />40,000. <br />40,000. <br />24 <br />Yard Piping and Fittings <br />1 <br />LS <br />$240,000. <br />$ <br />240,000. <br />25 <br />Building Plumbing Systems and Fie <br />I <br />LS <br />$ <br />$ <br />Protection Systems <br />10,000. <br />10,000. <br />26 <br />Building HVAC Systems <br />1 <br />LS <br />$ <br />$ <br />30,000. <br />30,000, <br />27 <br />Yard Conduit <br />1 <br />LS <br />$ <br />$ <br />85,000. <br />85,000. <br />28 <br />Building and Site Electrical and Lighting <br />I <br />LS <br />$ <br />$ <br />System <br />280,000. <br />280,000. <br />29 <br />VFD Motor Control Center <br />I <br />LS <br />$ <br />$ <br />450,000. <br />450,000. <br />30 <br />Automatic Transfer Switch <br />1 <br />LS <br />$ <br />$ <br />20,000. <br />20,000. <br />31 <br />Excavation Safety Measures <br />I <br />LS <br />$ <br />$ <br />8,000. <br />8,000. <br />32 <br />Sodium Hypochlorite Generation Unit <br />1 <br />LS <br />$ <br />$ <br />185,000. <br />185,000. <br />P-2 of P-17 <br />ay <br />0,y <br />