My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON (SCE) (4)
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON (SCE) (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 7:57:11 AM
Creation date
1/5/2017 7:51:55 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON (SCE)
Contract #
N-2016-194
Agency
Public Works
Expiration Date
12/31/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIES <br />This Contract for Extension of Electric Distribution Line ("Contract") is issued this day of <br />12 day of September 2016 <br />The Parties to this Contract are: <br />CITY OF SANTA ANA <br />("Applicant") <br />and Southern California Edison Company ("SCE"). Applicant and SCE are referred to individually <br />as "Party" and collectively as "Parties". <br />2. RECITALS <br />Applicant has requested SCE, pursuant to SCE's Rule 15, Distribution Line Extensions, to install <br />an electric Distribution Line Extension to the location or locations described as follows: <br />202 3/4 S FLOW ER ST SANTA ANA CA 92703 <br />(Hereinafter referred to as "Project") <br />3. AGREEMENT <br />3.1 Responsibilities of Applicant <br />Construction <br />Applicant shall, in accordance with SCE's specifications and timing requirements for the <br />Project: <br />o Perform route clearing, tree trimming, trenching, excavating, and backfilling and <br />compacting; <br />o Furnish imported backfill material and dispose of trench spoil as required; <br />o Furnish, install and transfer ownership to SCE any substructures, conduit, and <br />protective structures required; <br />o Obtain any necessary construction permits for all work performed by Applicant <br />under this Contract. <br />If Applicant elects to have SCE perform any part of this work, Applicant shall pay to SCE, <br />as specified herein and before the start of construction, SCE's estimated -installed costs <br />thereof. <br />Form No. 16-330 <br />Rev. 12/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.