My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (9)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 1:45:40 PM
Creation date
1/17/2017 1:22:40 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
16-6870
Agency
Public Works
Council Approval Date
12/6/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Status: Completed <br />Approximate Start/End Dates; Nov 2013 -Jan 2014 <br />Description of Supplies, Equipment, or Services Provided: Modify Traffic Signal at <br />One Intersection along with Traffic Control, LED Illuminated Street Name <br />Signs, Install New Cabinet, Safety Lighting, Loops, Vehicle Pre-emption <br />System, Sidewalk Access Ramps & Traffic Signal Heads. <br />Woodruff/Washburn Traffic, Signal <br />Amount: $156,697.58 <br />Owner: City of Downey <br />Owner Address: 11111 Brookshire Ave Downey, CA 90241 <br />Project Manager: Keith Hoey <br />Contact Phone #: (562) 622-5898 <br />Fax #: (562) 904-7296 <br />Status: Completed <br />Approximate Start/End Dates: Apr 2013 -Aug 2019 <br />Description of Supplies, Equipment, or Services Provided; Upgrading Traffic Signal <br />at Intersection, Trenching, Conduit Runs, and Installation of LED Safety <br />Lighting, <br />Traffic Signal Modification at Broolchurst <br />Amount: $237,213,67 <br />Owner: City of Huntington Beach <br />Owner Address: 2000 Main Street Huntington Beach, CA 92648 <br />Project Manager: John Griffin <br />Contact Phone #: (714)375-5011 <br />Fax #:(714)374-1648 <br />Status: Completed <br />Approximate Start/End Dates: March 2011-Sept2011 <br />Description of Supplies, Equipment, or Services Provided: Modify Traffic Signal at <br />Multiple Intersections along with Traffic Control, Installation of Curb Ramps & <br />Traffic Signal Heads, and Monument Preservations. <br />Traffic Signal System Upgrade Phase V -VIII <br />Amount; $292,175.99 <br />Owner: City of Santa Ana <br />Owner Address: 20 Civic Center Plaza Santa Ana, CA 92701 <br />Project Manager: William Albright <br />Contact Phone #: (714) 647-5029 <br />Fax #: (714) 647-5622 <br />Status: Completed <br />Approximate Start/End Dates: Jan 2011 -Aug 2011 <br />Description of Supplies, Equipment, or Services Provided: Installation of Conduit, <br />Pullboxes, Traffic Signal, Interconnect Cable, Communication Equipment, <br />Page 3 of 4 <br />Domment Last Updated 41JI2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.