My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GREAT WESTERN RECLAMATION, INC. TECHNICAL PROPOSAL PART 1
Clerk
>
Contracts / Agreements
>
TRASH CONTRACTS & MISC. FRANCHISE AGREEMENTS
>
TRASH / SOLID WASTE COLLECTION
>
GREAT WESTERN RECLAMATION
>
GREAT WESTERN RECLAMATION, INC. TECHNICAL PROPOSAL PART 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 11:38:51 AM
Creation date
3/1/2017 11:38:32 AM
Metadata
Fields
Template:
Contracts
Company Name
GREAT WESTERN RECLAMATION PART 1
Agency
Public Works
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial loads will be weighed much the same way, except, instead of <br /> sorting materials on the processing line, material will be manually sorted and <br /> placed in roll-off bins designated for the City of Santa Ana only. <br /> The following information will be available to the City on a monthly, <br /> quarterly, and yearly basis. <br /> • Total tonnage delivered <br /> • Total tonnage disposed at landfills <br /> • Overall diversion percentage <br /> • Total tonnage diverted by material type <br /> • Cardboard • PET <br /> • Mixed paper • HDPE <br /> • Newspaper • Wood/yard waste <br /> • Aluminum for boiler fuel <br /> • Tin cans • Wood/yard waste <br /> • Bulk metal/white goods for compost <br /> • High-grade paper or mulch <br /> • Inerts (concrete, asphalt, dirt) <br /> Transportation and Disposal of Residue Waste <br /> All non-salvageable waste and residual material from sorting operations <br /> will be transferred to trailers for transport to local landfills. Transfer trucks <br /> will begin the loading cycle by backing down the transfer ramp. Wheeled <br /> loaders will then top-load trailers by pushing the waste from the tipping area <br /> into the trailer. A tamping crane will be used to evenly distribute the load <br /> in the trailers and tamp down the load. When a transfer trailer is full, it will <br /> climb up the transfer ramp and proceed to the facility scales to weigh out <br /> prior to exiting the site. Transfer trailers will use Bowerman Landfill as the <br /> primary disposal location. <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.