Laserfiche WebLink
The date at which these guarantees are effective is listed below: <br /> July 1, 1994 January 1, 2000 <br /> HOURS 15.66 17.13 <br /> TPH 80 80 <br /> TPD 1,253 1,370 <br /> TPY 390,852 427,531 <br /> The facility is being designed with four mixed waste sorting lines <br /> each of 20 tons per hour, plus 1 C&D sorting line of 20 tons per <br /> hour, plus 20 tons per hour of wood/green waste processing and a <br /> segregated material/material cleanup processing facility. <br /> Processing and Recovery Techniques <br /> The SAMRF will be a full-service material recovery facility. As <br /> such, it will process all wastestreams (residential, commercial, <br /> industrial) and is designed to recover for recycling and composting <br /> a minimum of 25% of the incoming waste at the outset of operations. <br /> The overall processing strategy of the SAMRF is to isolate the major <br /> wastestreams and to process them separately. Separate processing <br /> will enable the facility to accurately account for the City's diversion <br /> rate at the facility by wastestream and material type. <br /> Taking advantage of the large site and existing buildings, the <br /> SAMRF will provide several distinct waste receiving and processing <br /> areas. The layout of the facility will provide extensive material <br /> storage, maximize material recovery, and facilitate accurate record <br /> keeping. <br /> 44 <br />