Laserfiche WebLink
will be entered into the facility's computer system under the City's <br /> account. Material which requires further processing before shipping <br /> to market, such as green or wood waste, will be weighed prior to <br /> processing. <br /> For industrial waste, C&D debris, and bulky items, trucks from <br /> the City of Santa Ana will weigh-in at the east gate for a total weight <br /> and proceed to tip their waste in City-designated concrete bunkers <br /> located just east of the C&D Material Processing Building. When a <br /> sufficient stockpile of material from Santa Ana has accumulated in <br /> the bunker each day, the C&D sorting line will be cleared of all <br /> existing material, and a loader will push the City's material into the <br /> building and processing will begin. When a bin fills with material, this <br /> bin will be weighed and the amount and type of material will be <br /> credited to the City. Material which requires further processing <br /> before shipping to market, such as green or wood waste, will be <br /> weighed prior to processing. <br /> For public loads, each driver will be asked to state the origin of <br /> their load and the type of material they are bringing to the facility. <br /> Public loads will be weighed and recorded in the facility's computer <br /> system. Depending on the type of material, public loads will be <br /> directed to one of the processing building and will tip their load in <br /> City-designated areas. The waste will be processed, weighed, and <br /> recorded as described above. <br /> Incoming waste that will not be processed will be weighed, the <br /> City of origin noted, and recorded in the computer system before <br /> being transferred to local landfills for disposal. <br /> All materials flow operations at the SAMRF will be controlled by <br /> a sophisticated PC-based software system designed to organize and <br /> simplify the entire inventory management process from weight ticket <br /> entry and contract allocation to shipment of processed inventory and <br /> management of activity reporting and billings. <br /> 54 <br />