My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROADWAY CONSTRUCTION SERVICE - 2017
Clerk
>
Contracts / Agreements
>
R
>
ROADWAY CONSTRUCTION SERVICE - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 11:32:12 AM
Creation date
3/13/2017 4:09:41 PM
Metadata
Fields
Template:
Contracts
Company Name
ROADWAY CONSTRUCTION SERVICE
Contract #
N-2017-023
Agency
Public Works
Expiration Date
3/31/2017
Insurance Exp Date
4/16/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N� E-54072 <br />Paae 2 of 2 <br />4 <br />13 dys <br />1 ea <br />8 hrs <br />$78.00 hourly <br />Traffic ControlierlFlagger <br />$8,112.00 <br />Professionally trained and equipped traffic controller (flagger) for the <br />purpose of setting up and maintaining traffic control devices, or <br />otherwise controlling and directing vehicle or pedestrian traffic through <br />or around the work area. A four (4) hour min. charge applies for each <br />traffic controller per shift. Additional traffic controllers) not used/billed i <br />conjunction with a traffic control setup will be billed portal to portal. Thi <br />also applies to any standby time onsite. Overtime rates apply after eight <br />(8) hours and on Saturdays. Double time rales apply after twelve (12) <br />hours, on Sundays and Holidays. <br />Private Rates: $50/hr (ST), $66/hr (OT), & $81/hr (DT) <br />Prevailing Wage Rates: $78/hr (ST), $104/hr (OT), & $130/hr (DT) <br />5 <br />4 dys <br />$334.00 El <br />Secondary Lane Shift <br />$1,336.00 <br />Mobilization of labor and equipment to job site only. Equipment include <br />up to thirty (30) cones, seven (7) typed barricades, five (5) regulatory <br />signs, and four (4) warning signs with stands. <br />This price does not include ensile time for installation, maintenance, or <br />removal. Please see below for additional hourly rates <br />Additional rental rate of above equipment; <br />- $54.01 $267.001wk; $800.001mo(4-wk) <br />6 <br />4 dys <br />1 ea <br />8 hrs <br />$78.00 hourly <br />Traffic Controller/Flagger <br />$2,496.00 <br />Professionally trained and equipped traffic controller (flagger) for the <br />purpose of setting up and maintaining traffic control devices, of <br />otherwise controlling and directing vehicle or pedestrian traffic through <br />or around the work area. A four (4) hour min. charge applies for each <br />traffic controller per shift. Additional traffic conlroller(s) not used/billed i <br />conjunction with a traffic control setup will be billed portal to portal, THE <br />also applies to any standby time onsite. Overtime rates apply after eight <br />(8) hours and on Saturdays. Double time rates apply after twelve (12) <br />hours, on Sundays and Holidays. <br />Private Rates: $51 (ST), $66/hr (OT), & $81/hr (DT) <br />Prevailing Wage Rates: $78/hr (ST), $104/hr (OT), & $131 (DT) <br />7 <br />4 ea <br />$250.00 ea <br />Post'No Parking' & Meters <br />$1,000.00 <br />Posting of temporary "No Parking" signs and bagging of parking meters <br />for scheduled construction dates, and notification of appropriate parkin <br />enforcement Agency. <br />***Does not include payment of meter revenue to enforcement Agency, <br />as required. <br />Cost is per instance, projects that have the start of construction pushed <br />from original date will incur additional no -parking installations to re -post <br />signs for new date. <br />EXCLUSIONS; <br />The following is not included in this estimate: Tax; Encroachment Permits; Traffic Control Plans; <br />Traffic Signal Plans; Lost or damaged equipment; Business ardlor resident notlicalion; <br />Temporary striping or striping removal; Construction fencing; SleelRrench plates; Changeable <br />message signs (Cl Custom signage; Replacement or modification of existing facilities; Other <br />STANDARD TERMS & CONDITIONS: <br />1) Although TMI maintains standard general liability, workers compensation, and other Insurance <br />coverages, additional tests may be incurred for the issuance of insurance certificates that <br />require special wording, endorsements, or additional coverages or policy changes. 2) Information <br />provided herein should be relied on for estimating purposes only. 3) This estimate Is based on <br />information available and/or provided at the time of the eatimato request, such as current permit <br />rates and requirements from public agencies, and is subject to charge without notice. 4) TMI <br />reserves the right to modify this estimate should the scope of the project change or additional <br />information Is provided. 5) Unless otherwise specified,individual line items and rates are based <br />on acceptance of the estimate as a whole. Significant changes in quantities, additionldeletion of <br />line -Items, or selection of single line-ilems may result in price changes. 6) Prices are valld for up <br />to 60 days. 7) All orders for standard traffic control and equipment (without permit or posting <br />requirements), will require at least three working days advance police; additional time may be <br />required for non-standard and/or large scale traffic control. General availability of traffic control is <br />not guaranteed and Is subject to availability and schedule of TMI crews and equipment. Allow up <br />to 14 working days for traffic plan turn -around (from time of order to initial submittal.) Agency <br />approval and turn -around time of traffic control plans may vary and cannot be guaranteed. 8) <br />Permit approval and fimellne often vary Imm Agency to Agency and no guarantee of approval or <br />approval limellne is represented. 9) Compensation will be charged for jobs that require special <br />safety training requirements and security clearance. 10) Unless stated otherwise, this estimate Is <br />based on work being performed during normal field working hours (7:00am 10 3:30pm) Monday <br />through Friday. Additional costs will be Incurred and Invoiced for after hours work, weekend <br />and/or holidays. 11) ACCEPTANCE OF THIS ESTIMATE: Unless otherwise agreed In writing, <br />acceptance of this estimate shall authorize TMI to perform all work as stated, and this document <br />shall serve as the binding contract, subject to the terms and conditions herein. 12) FUEL <br />SURCHARGE: A fuel surcharge may be applied to any services requiring travel, transportation or <br />mobilization. <br />DATE PREPARED: ESTIMATED TOTAL: <br />Anthony Palella X 12/12/2016 $28,131.00 <br />TMI ESTIMATOR COSTOMERACI(NOWLEDGEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.