Laserfiche WebLink
CITY OF SANTA ANA <br />PROJECT NO. 16.6467 <br />SANTA ANA DELHI CHANNEL DIVERSION PROJECT Exhibit A <br />PROPOSAL <br />1AADDENDUM ONE - JULY 22. 20191 <br />Item <br />Description <br />_ <br />Quantity <br />Unit <br />Unit <br />Price <br />Amount <br />12 <br />Chain Link Gate <br />IT . g—EA- <br />q13 <br />13 <br />CaeComposed GGraniteAccess <br />Road _ <br />400 <br />TN <br />14" PVC Force Main Inln C1CFCD <br />ROW <br />1000 <br />LF <br />15 <br />1'4" PVC Force Main In Costa <br />Mesa ROW <br />3300 <br />_DF—_ <br />$ <br />16 <br />*14" PVC Siphon <br />10 <br />EA <br />$ a;306,,, <br />$ <br />17 <br />*14" PVC Forced Main Installed <br />Qeeper Than 1 -Foot But Less <br />Than 3 -Feet. <br />10 <br />18 <br />*Pothole Utilities Not Shown In <br />The. Contract Documents <br />20 <br />EA <br />_ <br />$ ...o�,.•r <br />Q 4. <br />19 <br />*PCC Concrete Sidewalk <br />400 <br />SF <br />20 <br />'*PCG Coriarete Drive Approach <br />400 <br />SF <br />$Ipm <br />$ ate. <br />21 <br />*PCC Concrete Curb Ramp - <br />– 400 <br />SF <br />$ <br />22 <br />*FICC Concrete C&G <br />500 <br />LF <br />$ <br />$ I <br />23 <br />*Asphalt Concrete <br />1000 <br />TN <br />-25 <br />(ARHM) <br />*Adjust Manhole Frame &. Cover <br />to Finished Grade <br />26 <br />*Adjust Water Valve Box Frame <br />and Cover to Finished Grade <br />15 <br />27 <br />*Traffic Loopy <br />2 <br />Project IlnformWion Signage <br />29 <br />Finish Grading, Irrigation, and <br />Landscaping <br />1 <br />L5 <br />$t"7 <br />$ 23,17r� <br />TOTAL IBID <br />$ <br />ne iaj wesrt responsigle taltger snail q9 selected based on the total base bid. <br />City of Santa Ansi 1 Project 16.6467 Santa An F I aT W IPel Diver8lon Project I f3Et3lO-October 7, 2016 <br />