Laserfiche WebLink
5COPF OF WORK: <br />Our subcontractor to furnish ail labor (prevailing wages), materials, equipment, transportation, disposa[,- <br />services and Insurance for which specifically pertains to the following project activities. <br />1 -remove asbestos containing materials per the SCS survey dated December 20, 2016 Including transite <br />pipe; window putty & roof mastic <br />2 -perform lead abatement and stabilization of Items indicated per the SCS survey dated December 20, <br />2016 <br />3 -conduct a lead waste dlsposal' characterization of the complete structure to determine that all waste . <br />can be disposed of as construction debris / trash <br />Work to be completed in (2-3) shifts, 8 hrs, /shift Monday -Friday <br />All work tjo be completed in compliance with SCAQMD, CAI~ OSHA, SPA and Local Regulations <br />LUMP SUM PRICE, $3,647,00 <br />