Laserfiche WebLink
M <br />D E 5 1 G N nrc,l ireceuex . tnnnuave oxen,*ec*une . exnlo,r o¢s,en <br />FEE PROPOSAL <br />Revised Feb 24, 2017 CLR will carry -out the work described in our January 6, 2017 response to RFP NO: 16-131 <br />for a Lump Sum Professional Fee of One Hundred Sixty -One Thousand Three Hundred <br />Dollars ($161,300) as detailed in the Fee Breakdown chart below. <br />Reimbursable expenses are in addition to the Professional Fee and represent the cost of <br />travel (air/ground), long distance communication, reproduction (plotting, printing, digital <br />imaging), mailing, etc, and are estimated (not an upset limit) to be Seventeen Thousand <br />Three Hundred Fifty Dollars (517,350). <br />FEE BREAKDOWN <br />Arm Professional Fee 9i of Fee <br />CLR Design <br />$108,750 62.5% <br />Astute, Planning, ArchlrecrurV <br />Landscape Architecture <br />exhibit Gesian <br />Zoo Advisors <br />$40,050 25% <br />Strategic Business Plat rung <br />KPFF <br />$12,500 7.5% <br />Utility Infrastructure Planning <br />Total Pees $161,300 100% <br />CLR & Sub -consultant Expenses $7,450 <br />Zoo Advisors Expenses $91900 <br />Total Fees & Expenses $178,650 <br />QUALIFICATIONS <br />Workplan Scope Modifications & Clarifications: CLR is currently working with the Santa <br />Ana Zoo on the Giant River Otter Project, providing Full Design Services. As part of that <br />effort under contract, we will provide site Inventory & analysis of the existing Amazon's <br />Edge exhibit area, as well as services for developing new concepts for this 1-1.5 acre <br />zone within the heart of the campus. As part of this revised fee and scope proposal for <br />the Facilities Master Plan, we have made a slight reduction to work hours associated <br />with Tasks I - IV, as Cl will be providing analysis and design services under the Otter <br />Contract. Further, running both projects concurrently will allow for better coordination <br />of work products, and from a facilities and strategic planning standpoint, allow for <br />seamless integration of concepts at both the project and overall campus level. <br />2. On -Site Workshop Attendance: <br />CLR: (5) 2 -day workshops, 2 staff in attendance (See Proposed Schedule)* <br />ZA: (4) workshops/presentations including (2)2 -person trips and 12) 1 -person trips <br />KPFF: Assuming attendance at (3) half-day workshops/site visits <br />* As part of this revised fee and scope proposal, we are proposing to piggyback Otter <br />and Master Plan workshops as much as feasible, to allow fora slight reduction in design <br />t L 51-,M1A2s0 < 215-564.115) -, 833 Chestnut street vu t< 1000 pi adelphl9, pe =3197 <br />32?5 layuna canyon road, lute r I1'It na beacn.cn 92651 <br />2Ib'�4 <br />