My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2017-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
FULL PACKET_2017-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 4:44:32 PM
Creation date
3/31/2017 8:32:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
906
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City 0f Santa Arta Public <br />Public Works Ageocy <br />PROPOSAL - RFP 17-002 <br />Geographic Information Sy:tents Services and Data <br />DIGITAL MAP <br />PRODUCTS <br />PROPOSAL OPTION 2: Digital Aerial Orthopheatography <br />Project scope <br />The City of Santa Ana seeks to acquire 7.5 cm (V) pixel resolution color digital Orthophotography. The <br />Orthophotography will be captured with a large format calibrated digital aerial mapping camera, it will be <br />Ortho-roctified using an accurate DTM created from the digital imagery (accuracy and additional specs <br />below). The project limits will be based upon the attached boundary description document (Attachment 5), <br />DMP Proposes the continuation the integrated Orthophotography already in place at the City provided by <br />Eagle Aerial, which meet and exceed the requirements laid out in this scope of work. Eagle and DMP have <br />worked for years to integrate Eagle's streaming service with DMP's SaaS platform at a level of performance <br />that is industry leading and free of lag and failure issues that often occur when merging diverse solutions. <br />The integration process was complex and required the implementation of proprietary technologies and skill <br />sets that allow the level of integrative performance between the Eagle imagery stream and the DMP <br />software solution to be seamless. Due to the extensive efforts over the years, performance specs meet or <br />exceed the following industry leading standards: <br />Availability: 99.99% uptime <br />Response Times: <br />90% tiles under ASOms <br />49% tiles under 800ms <br />99.99% tiles under 120oms <br />The City desires to have one point of contact for all interactions with the Vendor in regards to the Digital Atrial <br />Orthaphotography Project. The City also desires the option to change the point of contact as needed during <br />the course of the agreement, at the City's discretion. <br />See Project Management and oversight proposed in Company overview – Project Team Members, <br />The city desires to enter into a three-year agreement with the vendor with the option to extend the agreement <br />for an additional two years. In the sealed fee proposal, the Vendor will provide four (4) quotes based on the <br />project requirements listed below for the following deliverable schedules: <br />Initial Three Year Contract Schedules: <br />Delivery Schedule one: Imagery flown and delivered in years one, two and three. <br />Delivery Schedule Two: Imagery flown and delivered in year one and year three. <br />ExtendecJ—Fptlrt1LaanI fifth Year Contract Scheduig <br />Delivery Schedule Three: Imagery flown and delivered in year four and year <br />five. Delivery Schedule Four: Imagery flown and delivered in year five. <br />211Page <br />25H-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.