Laserfiche WebLink
MAYOR <br />Miguel A. p0do <br />MAYO PRO TEM <br />Claude C, Alvarez <br />COUNCILMr-MBERS <br />David denavidea <br />Carlos Bustamanto <br />Mlcholo Martinez <br />Vinoont P. Sarmiento <br />Sal'rhaiero <br />December 6, 2016 <br />ADDENDUM No, TWO <br />CIT OF SANTA ANA <br />PUBLIC WORKS AGENCY M-36 <br />P.O. Box 1088 <br />Santa Ana, California W02 <br />SUBJECT: PROJECTNo. 14-7513; Pacific Electric Park <br />INTERIM CITY MANAGER <br />Raul M, Walters <br />CITY ATTDRNEY <br />Sonla Carvalho <br />CLERK OF THE COUNCIL <br />Marla D. FlWzar <br />The fallowing changes have been made to the plans and specifications of the subject <br />project: <br />Flans <br />1. Sheet L-1.02, Construction Nate "J": Revise first.sentence of note "J" to read as <br />follows: <br />"Furnish and install rock climber by Landscape Structures, Inc., Design 4, !Model <br />#168367, available through Coast Recreatton." <br />2, Sheet L-2.08, Raised Garden Bed Detail B: Add nate "F" as follows: <br />`All redwood shall be construction heart, with smooth -planed flnish" <br />3, replace sheet D-6 (sheet 27 of 71) <br />4. Replace sheet E-1.01 (sheet 59 of 71). <br />§jpgcificaticans <br />1. Sheets P-7 through P-10: Replace shoets P-7 through P-10 with the now sheets P-7 <br />through P-10 (qf P-24), attached. <br />2. Page 13, Section 7-3,6.2 Best Management Practices (BMPs): dolete this section. ' <br />8. Page 26, Section 3.04 TRAFFIC CONTROL. PLAN PREPARATION AND <br />SUBMITTAL: delete this section. <br />4. Appendix A, Definition of Bid Items: Replace sheets I through 8 with new sheets 1. <br />through 8, attached. <br />5. Appendix G: Replace Appendix G with the riew Appendix G, attached. <br />23A-68 <br />