Laserfiche WebLink
COST" ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 14-7613: PACIFIC ELECTRIC PARC <br />Construction Contract <br />$ <br />1,996,650.00 <br />Contract Administration <br />$ <br />87 783.00 <br />Inspection and Testing <br />$ <br />115,822.00 <br />Contingencies <br />$ <br />214,436.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />2,416,891.00 <br />EXHIBIT 4 <br />234-77 <br />