My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GUEST HOUSE LP (2)-2016
Clerk
>
Contracts / Agreements
>
G
>
GUEST HOUSE LP (2)-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 1:19:42 PM
Creation date
5/2/2017 10:25:26 AM
Metadata
Fields
Template:
Contracts
Company Name
GUEST HOUSE LP
Contract #
A-2016-155
Agency
Community Development
Council Approval Date
6/21/2016
Notes
A-2016-369
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relatively good condition. All dead vegetation shall be removed. <br />• Fencing, walls and gates hazard -free and intact, All gates shall be <br />in good working order. <br />• The site shall be free from trash, debris and hazardous materials. <br />• Accessory buildings shall be safe and sound. <br />Paving <br />All new paving and walkways shall be constructed with concrete <br />(2,000 PSI @ 28 days). <br />• Driveways shall be reinforced with wire mesh. Sawn expansion - <br />contraction joints shall be placed every 8 feet in both directions. <br />• All paving and walkways shall be finished with a light broom <br />texture. <br />• All walkways shall be at least 3 feet wide. Sawn expansion - <br />contraction joints shall be placed every 4 feet. <br />Landscaping & <br />• To the extent possible and practical all new landscaping shall be <br />Irrigation <br />drought resistant. <br />+ When a lawn is being replaced, the new lawn area shall be reduced <br />to aid in the reduction of water consumption. <br />• New irrigation controllers shall be weather or sensor based and EPA <br />Water -Sense qualified. <br />+ All new irrigation systems shall be desi ned to conserve water. <br />Fences, Walls & Gates <br />+ All new wood fences shall be made from good quality materials. <br />They shall be properly supported with 4X4 pressure treated posts (8 <br />feet 4.C.) and 2X4 rails (top and bottom). The posts shall be embedded <br />in a concrete footing at least 18" deep. <br />• All new block walls shall be constructed with 6XSX16 concrete <br />block. They shall be properly supported by a continuous footing <br />and reinforced with steel bar. <br />
The URL can be used to link to this page
Your browser does not support the video tag.